Laserfiche WebLink
<br />. <br /> <br />. <br /> <br /> <br />Obtain topographic mapping and surveys for project area <br /> <br />2 <br />3 <br /> <br />Project coordination and overall project management <br />Performance of all tasks and report writing to complete chapter I <br />(Problem Description) of the project report <br />Performance of all tasks and report writing to complete chapter <br />II (proposed Solutions) of the project report <br />Performance of all tasks and report writing to complete chapter <br />III (Description of Proposed Project) of the project report <br />Performance of all tasks and report writing to complete chapter <br />IV (Cost Estimate) of the project report <br />Performance of all tasks and report writing to complete chapter <br />V (Cost Effectiveness) of the project report <br />Performance of all tasks and report writing to complete chapter <br />VI (National Flood Insurance Program) of the project report <br />Performance of all tasks and report writing to complete chapter <br />VII (Environmental Information) of the project report <br />Performance of all tasks and report writing to complete chapter <br />VIII (Work Schedule) of the project report <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br /> <br />8 <br /> <br />9 <br /> <br />10 <br /> <br />11 <br /> <br />Performance of all tasks and report writing to complete chapter <br />IX (Authorization) of the project report <br />Compilation of all text, maps, figures, and drawings for final <br />report, Editing and publication of final report. <br />Compilation of all materials and publication of the final <br />Appendix (Technical Addendum) of the project report <br />Compilation of all materials for the "Summary of Attachments" <br />of the project <br />Any public meetings or necessary communications with <br />residents, local officials, or other interested parties <br /> <br />12 <br /> <br />13 <br /> <br />14 <br /> <br />15 <br /> <br />,,""':::'2,~signed <br />:~!l:~~1ipop~ible . <br />.:,.;.,',':,:,.E',',',' tity <br />" ":,,';, n <br />CWCB <br />Local Sponsor <br />CWCB <br />Local Sponsor <br />Contractor <br />Contractor <br /> <br />CWCB <br />Contractor <br />CWCB <br />Contractor <br />CWCB <br />Contractor <br />Contractor <br /> <br />Contractor <br /> <br />CWCB <br />Local Sponsor <br />Contractor <br />Contractor <br /> <br />Contractor <br /> <br />Contractor <br /> <br />Contractor <br /> <br />CWCB <br />Local Sponsor <br /> <br />Specific portions of Tasks 3 through 14 for the Contractor to complete are outlined below, All <br />work shall meet or exceed FEMA's requirements for an HMGP application. Application <br />information will be provided by the CWCB to the Contractor. <br /> <br />Task 3 <br />The Contractor shall interview the local sponsors, City of Sterling and Logan County officials, <br />the staff of the Colorado Water Conservation Board, local residents, the Sterling No. I Irrigation <br />Company, and area flood victims to obtain a full understanding of the flood issues, In addition, <br />the flood problems are defined and presented in a number of flood-related publications which are <br />listed in a publication entitled "City of Sterling Drainage and Flood Control Implementation <br />Plan," dated June 1997, which is prepared by ICON Engineering, Inc. <br /> <br />3 <br />