My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04145
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:27 PM
Creation date
10/5/2006 12:22:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Thornton, Adams County
Basin
South Platte
Title
Major Drainageway Planning
Date
10/1/1980
Prepared For
Thornton, Adams County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />With regulation, future flood damage potential would tend to decrease due to the limita- <br />tion of construction permitted in the floodplain. This regulation should include on-site <br />erosion control during new development construction, and require on-site detention for <br />completed development in the basin. <br /> <br />Apart from the primary benefit of flood control, several secondary and indirect <br />benefits would result from construction of the proposed improvements. Among them <br />include land enhancement and increased recreation opportunities. The grass-l.ined channel <br />through Reaches 1 and 2 in Adams County would provide a continuous green belt and the <br />maintenance road could double as a hiker/biker/equestrian trail. Through Reach 3, the <br />maintenance road, which parallels the overflow channel and skirts the northern edge of <br />the detention ponds, is congruous with the bikeway system described in the City of <br />Thornton's Comprehensive Plan and could be utilized as such. North of East 112th <br />Avenue, properly constructed subsurface drains would enable the proposed detention <br />facility to be used as a park open space and/or athletic field. <br /> <br /> TABLE H <br />JURISDICTIONAL COST BREAKDOWN SUMMARY <br /> City of Adams <br />Item Thornton County <br /> Phase I Phase II <br />Channel Improvements $ 754,700 $ 765,300 $ 737,100 <br />Street Crossings 189,200 137,200 0 <br />Utility Relocations 12,800 0 0 <br />Subtotals $ 956,700 $ 902,500 $ 737,100 <br />2596 Contingency * 239,200 225,600 184,300 <br />Total Construction Costs $ 1,195,900 $ 1,128,100 $ 921,400 <br />Right-of-Way Acquisition 0 57,300 30,400 <br />Present Worth - Operations <br />and Maintenance ** 304,200 189,400 194,500 <br />Total Improvement Costs $ 1,500,100 $ 1,374,800 $ 1,146,300 <br /> <br />* <br /> <br />Includes cost for fiscal, legal and administrative fees, engineering, surveying, con- <br />struction inspection, and other construction contingencies. <br /> <br />** <br /> <br />Based on capitalized annual costs over a 50-year period using a 6-5/8 percent dis- <br />count rate. <br /> <br />1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.