My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04145
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:27 PM
Creation date
10/5/2006 12:22:50 AM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Thornton, Adams County
Basin
South Platte
Title
Major Drainageway Planning
Date
10/1/1980
Prepared For
Thornton, Adams County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE IV-2 <br /> <br />ALTERNATIVE INVESTKlATED - PHASE "AfT <br />DIRECT FLOW AREA 0054 <br /> <br />Reach Location Alternative Examined Frequency <br />1 Confluence with South a. Existing condition <br /> Platte River to Riverdale b. Grass-iined channel 2 & 100-Year <br /> Road <br /> c. Land acquisition 2, 10 & 100-Year <br />2 Riverdale Road to Holly a. Existing condition <br /> Street b. Underground conduit 2 & 100-Year <br /> c. G rass-iined channel 2,50 & 100-Year <br /> d. Concrete-lined 2 & 100-Year <br /> e. Selected structural improvements 2,10 & 100-Year <br /> f. Selected structural improvements 10 & 100-Year <br /> g. Land acquisition 100-Year <br /> h. Non-structural 100-Year <br />3 Holly Street to East 112th a. Existing condition <br /> Avenue b. Grass-iined channel & selected 10-Year <br /> structural improvements <br /> c. Concrete-lined channel & 10 & 100-Year <br /> selected structural improvements <br /> d. Underground conduit 100-Year <br /> e. Detention facilities 100-Year <br /> <br />East 112th Avenue to <br />Upstream Study Limits <br /> <br />4 <br /> <br />a. Existing condition <br />b. Selected structural improvements <br />c. Selected structural improvements <br /> <br />10,50 & 100-Year <br />10-Year <br /> <br />d. Grass-lined channel <br />e. Land acquisition <br /> <br />2,10 & 100-Year <br />10 & 100-Year <br /> <br />f. Grass-lined channel & selected <br />structural improvements <br />g. Detention facilities <br /> <br />10 & 100-Year <br /> <br />N-4 <br /> <br />Remarks <br /> <br />Floodplain zoning and regulation without modifications to existing channel. <br />Construct continuous grass-lined channel and improve irrigation ditch <br />crossing at Lower Clear Creek Canal. <br />Acquire all land area within reach subject to flooding. <br /> <br />Floodplain zoning and regulation without modifications to existing channel. <br />Construct continuous underground culvert for entire reach. <br />Construct continuous grass-iined channel for entire reach and improve <br />culvert at Riverdale Road. <br />Construct continuous concrete-iined channel for entire reach and improve <br />culvert at Riverdale Road. <br />Improve cul vert at Riverdale Road <br />Provide collector ditch along Riverdale Road and culvert beneath 112th <br />Avenue and Holly Street for Middle and Northern Branches. <br />Acquire flood prone property and relocate residents. <br />Flood proof residence by constructing earthen levee around the structure. <br /> <br />Floodplain zoning and regulation without modifications to existing channel. <br />Construct grass-lined channel from 112th Avenue to Upper Pond and improve <br />culverts and spillway of Upper and Lower Ponds, relocate Colo. Ag. Canal to <br />east of Holly St. <br />Construct concrete-lined channel from 112th Avenue to Upper Pond and <br />improve culverts and spillway of Upper and Lower Ponds, relocate Colo. <br />Ag. Canal to east of Holly St. <br />Continue culvert from 112th Ave. to Upper Pond. <br />Continue culvert from 112th Ave. to Upper Pond. Enlarge Upper Pond to <br />16 A.F. and Lower Pond to 12 A.F. either separately or simultaneously <br />in conjunction with 22 A.F. Pond above East 112th Ave. <br /> <br />Floodplain zoning and regulation without modifications to existing channel. <br />Enlarge underground conduit and inlet at East 112th Way cul-de-sac. <br />Regrade East 112th Place from East 112th Way to Cherry Drive to divert <br />flows away from cul-de-sac. <br />Construct grass-iined channel from Cherry Drive to East 112th Ave. <br />Acquire flood prone property and relocate residents in vicinity of E. 112th <br />Way cul-de-sac. <br />Combine alternatives (b) and (d) above, continuous channel improvements <br />from East 112th Way cul-de-sac to East 112th Ave. <br />Enlarge East 112th Avenue Pond to 18, 22 or 27 A.F. <br />
The URL can be used to link to this page
Your browser does not support the video tag.