Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />e <br /> <br />DRAINAGE CRITERIA MANUAL (V. 1) <br /> <br />TABLE OF CONTENTS <br /> <br />Urban Storm Drainage Criteria Manual <br /> <br />Preface <br /> <br />1,0 <br />2,0 <br /> <br />ACKNOWLEDGEMENTS ... <br /> <br />.,..,...,...,....,."....,...,..,..,...".,."..,..,..,.....,........P-1 <br /> <br />..........P-5 <br /> <br />PURPOSE OF THE MANUAL ................., <br /> <br />3.0 LIST OF ABBREViATIONS........,.... ........,'"'' ,.., '...,.....,..., ,..........,....,...,....,.........,....,...,...............P-7 <br /> <br />Drainage Policy <br /> <br />1 ,0 STATEMENT OF POLICY ......,....,....,.......,..............,................,............................,................... DP-1 <br /> <br />1 .1 Policy..."....,....,.........,..........,....,........,....,....,.........,.....,....,............. .....,....,.........,....,..... DP-1 <br />1 .2 Principles..,.....,.... ..........,.....,...,...,....,....,....,....., ,..,......,....,....,...,........................,....,..... DP-2 <br />1,3 Basic Knowledge......,..........,..., ,............,....,...., ,...,.....,....,........,.....,....,....,.......,.....,....., DP-2 <br />1.4 Planning...,....,...."..,.....,....,....,........,...., ....,.........,.....,....,.....,..,.....,....,............... .,.......,. DP-3 <br />1.5 Technical Issues ..........,...., ,..,........,.........,.....,..., ,..........,....,...,..............,....,...,.....,...., ,. DP-3 <br />1.6 Flood Insurance ....,.....,....,.............,....,....,....,....,.....,....,..............,....,....,........,.....,.....,. DP-4 <br />1,7 Implementation..,...,.....,....,...,........,...., .....,..... .........,.....,....,.... .... .....,.........,..., .....,....,... DP-4 <br /> <br />2,0 <br /> <br />PRINCIPLES .....,...."....,. ........,....,.........,..., ....,.........,..... ..........,.........,...,.........., ...., .... ............... DP-6 <br />2.1 Drainage Is a Regional Phenomenon That Does Not Respect the <br />Boundaries Between Government Jurisdictions or Between Properties ...................... DP-6 <br />A Storm Drainage System Is a Subsystem of the Total Urban Water <br />Resource System...,.....,....,...., ........,...., ....,.........,....."....,....,.............,..........,.... ....,....., DP-6 <br />Every Urban Area Has an Initial (i.e., Minor) and a Major Drainage <br />System, Whether or Not They Are Actually Planned and Designed.........,................... DP-6 <br />Runoff Routing Is Primarily a Space Allocation Problem..............................,............,.. DP-6 <br />Planning and Design of Stormwater Drainage Systems Generally Should <br />Not Be Based on the Premise That Problems Can Be Transferred From <br />One Location to Another ..,.......,..,.....,.........,..............., ,..., '....,..,.........,...................,..... DP-6 <br />An Urban Storm Drainage Strategy Should Be a Multi-Objective and <br /> <br />Multi-Means Effort...,..............,........................,..........,....,.....,..,...... ....,....,....,...,........... DP-? <br />Design of the Stormwater Drainage System Should Consider the <br />Features and Functions of the Existing Drainage System............................................ DP-7 <br />In New Developments, Attempts Should Be Made to Reduce Stormwater <br />Runoff Rates and Pollutant Load Increases After Development to the <br />Maximum Extent Practicable ....,...,....,....,....,..... .....,.....,.........,........, ....,....,...,.....,....,... DP-? <br />The Stormwater Management System Should Be Designed Beginning <br />With the Outlet or Point of Outflow From the Project, Giving Full <br />Consideration to Downstream Effects and the Effects of Off-Site Flows <br />Entering the System...........,.............,....,....,...."...,....."....,....,.."....,..... ....,.... ........... ..... DP-8 <br />2,10 The Stormwater Management System Should Receive Regular <br /> <br />Maintenance..,.....,..... ...,....,....,........,....,....,....,....,.....,....".... .............,...., ....,...,. ......... ,DP-8 <br />Floodplains Need to Be Preserved Whenever Feasible and Practicable .................. .. DP-8 <br />Reserve Sufficient Right-of-Way for Lateral Movement of Incised <br /> <br />Floodplains..,.....,...,.....,....,... ......,..,..............,..........,.....,. ..,....,..., .....,...,.... ........,....,.... DP-9 <br /> <br />2,2 <br /> <br />2.3 <br /> <br />2.4 <br />2.5 <br /> <br />2.6 <br /> <br />2,? <br /> <br />2.8 <br /> <br />2.9 <br /> <br />2,11 <br />2.12 <br /> <br />3.0 <br /> <br />BASIC KNOWLEDGE....,...,.....,....,... .........,...,.........,..........,.....,....,...."............,..............,....,.. DP-l 0 <br />3,1 Data Collection .,........,....,.....,...,.."....,....,....,.....,...,......,....,....,..,....,....,....,....,...,......... DP-1 0 <br />3,1.1 Storm Runoff and Flood Damage ...., ................................................. DP-10 <br /> <br />6/2001 <br />Urban Drainage and Flood Control District <br /> <br />TOC-; <br />