Laserfiche WebLink
<br />.j <br /> <br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE CITY <br />OF WESTMINSTER, JEFFERSON COUNTY, COLORADO, UNDER THE NATIONAL FLOOD <br />INSURANCE PROGRAM <br /> <br />On June 17, 2003, the Department of Homeland Security's Federal Emergency Management Agency <br />identified Special Flood Hazard Areas (SFHAs) in the City of Westminster, Jefferson County, Colorado, <br />through issuance of a Flood Insurance Rate Map (FIRM), The Mitigation Division has determined that <br />modification of the elevations of the flood having a I-percent chance of being equaled or exceeded in any <br />given year (base flood) for certain locations in this community is appropriate, The modified Base Flood <br />Elevations (BFEs) revise the FIRM for the community, <br /> <br />The changes are being made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (Public <br />Law 93-234) and are in accordance with the National Flood Insurance Act of 1968, as amended <br />(TitIeXIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U,S,c. <br />4001-4128, and 44 CFR Part 65, <br /> <br />A hydraulic analysis was performed to incorporate channel modifications along Airport Creek from Eaton <br />Street upstream to 112th Avenue and has resulted in a revised delineation of the regulatory floodway, <br />increases and decreases in SFHA width, and increased and decreased BFEs for Airport Creek. The table <br />below indicates existing and modified BFEs for selected locations along the affected lengths of the <br />flooding source( s) cited above, <br /> <br />Location <br /> <br />Existing BFE <br />(feet)' <br /> <br />Modified BFE <br />(feet)' <br /> <br />ApproximateJy780'feel-downstream'of-West-l-I.2th.Avenue_5,281 <br />Approximately 170 feet downstream of West 112th Avenue 5,285 <br /> <br />5,280 <br />5,284 <br /> <br />'National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Division must develop criteria for <br />floodplain management. To participate in the National Flood Insurance Program (NFIP), the community <br />must use the modified BFEs to administer the floodplain management measures of the NFIP. These <br />modified BFEs will also be used to calculate the appropriate flood insurance premium rates for new <br />buildings and their contents and for the second layer of insurance on existing buildings and contents, <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Division reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or tec/mical data, All interested parties are on notice that until the <br />90-day period elapses, the Mitigation Division's determination to modify the BFEs may itself be changed, <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Ed Moss <br />Mayor, City of Westminster <br />4800 West 92nd Avenue <br />Westminster, CO 80031 <br />