My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04125
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:23 PM
Creation date
10/5/2006 12:21:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Interim Procedures for Evaluating Scour at Bridges
Date
9/1/1988
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />,-\ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, I <br />I <br />I <br />I <br />I <br /> <br />EXHIBIT III-C, 2 of 3 <br /> <br />Pier 2 <br />..F'ier scour <br />TOt.Al scour <br />Bed elevAti on <br />Scour elevAt.ion <br />Bot.tom of footing <br /> <br />9.8 ft. <br />11. 1 ft <br />1099.:5 ft <br />1089.4 ft. <br />1094.3 ft. <br /> <br />Monltor this bridge during high flows and carefully inspect it <br />aft.erwards. This would be a good sit.e to install a fixed <br />monit.or. Protection of t.he piers (And possibly t.he abutment.s) <br />should be considered. Discuss this bridge at the District 2 <br />interdisciplinary meeting. If for some reason the t.ailwater of <br />t.he dam is markedly changed, recalculat.e t.he scour potential. <br />The suseptibilit.y t.o failure of the bridge should b. <br />evaluated. <br /> <br />B-I3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.