My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04125
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:23 PM
Creation date
10/5/2006 12:21:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Interim Procedures for Evaluating Scour at Bridges
Date
9/1/1988
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FHWA TECHNICAL ADVISORY T 5140.20 <br />September 16, 1988 <br /> <br />(2) Bridge scour evaluations should be conducted for <br />each bridge to determine whether it is scour <br />critical. A scour critical bridge is one with <br />abutment or pier foundations which are rated as <br />unstable due to: <br /> <br />a <br /> <br />observed scour at the bridge site or <br /> <br />E <br /> <br />a scour potential as determined from a scour <br />evaluation study. (See Attachment, Chapter 5.) <br /> <br />(3) The interim procedures in Chapter 5 of the <br />Attachment should be followed in conducting and <br />documenting the results of scour evaluation studies. <br /> <br />d. Scour Critical Existinq Bridqes. A plan of action should <br />be developed for each existing bridge determined to be <br />scour critical. (See Attachment, Chapter 5.) <br /> <br />(11 The plan of action should include instructions <br />regarding the type and frequency of inspections to <br />be made at the bridge, particularly in regard to <br />monitoring the performance and closing of the <br />bridge, if necessary, during and after flood events. <br />(See Attachment, Chapter 7.) <br /> <br />(2) The plan of action should include a schedule for the <br />timely design and construction of scour <br />countermeasures determined to be needed for the <br />protection of the bridge. (See Attachment, <br />Chapter 7.) <br /> <br />e. Bridge Inspectors. Bridge Inspectors should receive <br />appropriate training and instruction in inspecting <br />bridges for scour. (See Attachment, Chapter 6.) <br /> <br />(1) The bridge inspector should accurately record the <br />present condition of the bridge and the stream. <br /> <br />(2) The bridge inspector should identify conditions that <br />are indicative of potential problems with scour and <br />stream stability. <br /> <br />(3) Effective notification procedures should be <br />available to permit the inspector to promptly <br />communicate findings of actual or potential scour <br />problems to others for further review and <br />evaluation. <br /> <br />4 <br /> <br />I <br />I <br />G <br />I <br />I <br />I <br />I <br />I <br />I <br />, I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.