My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD04125
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD04125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:45:23 PM
Creation date
10/5/2006 12:21:34 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Interim Procedures for Evaluating Scour at Bridges
Date
9/1/1988
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Abutments <br /> <br />1. Relief openings, spur dikes, and river training works should be used where <br />needed to .inimize the effects.~f adverse flow conditions at abutments. <br /> <br />2. Utilize riprap where needed to protect abutBInts. Design riprap to resist <br />the hydraulic forces associated with design conditions. <br /> <br />3. Where ice build-up is likely to be a problem, set the toe of spill-through <br />slopes or vertical abutment walls some distance fro. the edge of the <br />channel bank to facilitate passage of the ice. <br /> <br />4. Scour at spill through abutments is about SOl of that of vertical wall <br />abutments. <br /> <br />16 <br /> <br />. <br />. <br /> <br />I'"'' <br />';..... <br /> <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.