Laserfiche WebLink
<br /> <br />Action Items for Jamestown <br /> <br />ACTION ITEM AGENCY RESPONSmLE <br /> <br />Deploy spotter network and new <br />Flood Evacuation Plan for local <br />flood detection and warning JamestowDlBoulder Co <br /> <br />Purchase and deploy auxiliary <br />power supply <br />Ul lBil!'t!mn ill 3D <br />Evaluate the need for a revised <br />Floodplain Study <br /> <br />Jamestown <br /> <br />3lJ <br /> <br />CWCBlFEMA <br /> <br />Structural improvements of <br />Culvert crossing at Ward Street <br />(County Road 102.1) <br />1 1 Ul I nl!.. 1 ! ~1 I <br /> <br />Jamestown <br />U <br /> <br />Perform engineering analysis of <br />road embankment 1.1 miles west <br />of town Jamestown/Boulder CO <br /> <br />Conduct Town Meeting with <br />workshop on what home and <br />business owners could do to <br />protect themselves from the flood <br />hazard Jamestown <br /> <br />Develop annual stream <br />maintenance and cleanup programJVFD/& Volunteers <br />L -1 LllliJ 11 11 .L <br /> <br />Develop an ordinance for <br />tie-downs of above ground heating <br />gas tanks J milestown <br /> <br />Maintain a minimal sandbag <br />stockpile at the Jamestown Fire <br />Department JVFD <br /> <br />Figure - 15 - Flood Hazard Mitigation Activities <br /> <br />14 <br /> <br />TIME FRAME <br /> <br />Summer 1993 <br /> <br />Spring 1994 <br />!!H! li i: L <br /> <br />Fall 1993 <br /> <br />Fall 1994 <br /> <br />t <br /> <br />Summer 1994 <br /> <br />Spring 1993 <br /> <br />Each Spring <br />:: I l <br /> <br />Spring 1994 <br /> <br />Spring 1993 <br /> <br />STATUS <br /> <br />Proposed <br /> <br />Proposed <br />: 1!l l <br /> <br />: <br /> <br />Proposed <br /> <br />Proposed <br /> <br />Proposed <br /> <br />Scheduled <br /> <br />Proposed <br />.L lUi <br /> <br />: <br /> <br />Proposed <br /> <br />Proposed <br />