Laserfiche WebLink
<br />"buildable area" only refers to the area above the 100~year <br />floodplain. The entirety of this area may not be buildable <br />due to setbacks and other requirements. <br />AR-5 or larger: 1.00 acre <br />AR-1, AR-2, RD-1: 0.50 acre <br />RD~2: 0.25 acre <br />RD-3, RD-4: 7,500 sq. It. <br />RD~5 to RD-7: entire lot or 5,200 sq. ft., whichever <br />is less <br />entire area except parking lot, <br />streets, and open common areas <br />(re\o'iewed on a case-by~case basis) <br />entire area except parking lot, <br />streets, landscaping, unless pier <br />foundations are approved (reviewed <br />on a case~by.case basis) <br />2. For residential zoning, the area outside the I aD-year <br />floodplain must be contiguous or reasonably situated to <br />provide buildable area for a residence and associate <br />structures. Examples of structures include swimming <br />pools, sheds, barns, detached garages, and other <br />outbuildings that are normally associated with residential <br />development. <br />3. Buildable area above the lOa-year floodplain must be <br />constructed prior to map recordation. Floodplain and/ or <br />floodway easement will be required over the floodplain <br />outside the buildable area. Exceptions may be made for <br />parcel maps provided a condition of approval is attached <br />to the map requiring site plan review prior to issuance of <br />building permits. WRD [Sacramento County Water <br />Resources Division] requirements, including locations of <br />excavation and fill, limitation on fill in the floodplain, etc., <br />will be clearly indicated in the conditional approval. <br /> <br />RD-IO and denser: <br /> <br />Commercial and <br />industrial: <br /> <br />ACCESS <br />Discussion <br />Minimum access is required for all newly created parcels to <br />allow ingress~egress during storm events. This is required for <br />emergency access and to avoid creating "islands" during <br />normal flooding. The idea is to provide "reasonable" access, <br />but what is reasonable is highly subjective. At a minimum, <br />access should be above the IO-year flood elevation, to <br />minimize the occurrences of restricted access. <br /> <br />Policies <br />1. Vehicular access to the buildable area of newly created <br />parcels must be at or above the lO-year flood elevation. <br />Exceptions may be made when the existing public street <br />from which access is obtained is below the lO-year flood <br />elevation. <br /> <br />2. Watercourse crossings shall be minimized. Creating of lots <br />that require watercourse crossing for single lots or that will <br />likely encourage watercourse crossings to be built by <br />property owners (lots with usable area on both sides of the <br />watercourse) will not be allowed. Exceptions may be <br />granted for Agricultural and Agricultural/Residential <br />zoned parcels larger than five acres on a case~by~case basis. <br /> <br />OPEN WATERCOURSE EASEMENTS <br />Discussion <br />The County is requiring fee title easements be dedicated over <br />the laO-year floodplain on sites that are developed or subject <br />to discretionary actions. Different types of easements vvill be <br />required dependent on the flow situation vvith the specific <br />floodplain. Dedication of the easement will be required to <br />prevent any development within the floodplain that would <br />impact flooding, including postdevelopment fencing, grading, <br /> <br />58 <br /> <br />importation of fill, and construction of secondary structures. <br />The easements are intended to provide some measure of <br />assurance that the floodplain will not be significantly altered, <br />thereby impacting flooding. Explanation of the conditional <br />floodplain easement can be found in the Definitions section of <br />these policies. . . . Easements ",'ill be required as conditions of <br />discretionary actions, including rezone or map approval. <br /> <br />Policies <br />1. Upon development of a site, including rezones, and certain <br />applications for building or use permits, the following <br />easements will be required to be dedicated to the County. <br /> <br />a) Floodway easements will be required over the area of a <br />watercourse necessary to pass the peak IOO-year flow at <br />an elevation designated by the Water Resources <br />Division. <br /> <br />b) Floodplain easement will be required over the <br />remainder of the lOO~year floodplain outside areas to be <br />master planned or consistent with provisions of an <br />adopted Drainage Master Plan, if the site will be fully <br />built out under the proposed zoning. <br /> <br />c) When a site is not being fully built out under the <br />present zoning, or if a Drainage Master Plan has not yet <br />been adopted, then a Conditional Floodplain Easement <br />(see Definitions section) may be granted over that <br />portion of the floodplain that is less than hvo feet below <br />the 100~year water surface elevation. <br /> <br />2. Floodplain easements as set forth in policy l(b) and 1(c) <br />above will not be required for Agricultural and <br />Agricultural/Residential parcels except on a case~by~case <br />basis. <br /> <br />FENCING <br />Discussion <br />Fencing within the floodplain occurs frequently and can <br />significantly increase flood elevation. This is due to the <br />fences collecting debris and effectively creating a dam. <br />Limited fencing will be allowed within the floodplain <br />prm'ided that it does not create flow restrictions and allow <br />for the free flow of water. The policies will not apply to <br />Agricultural or Agricultural/Residential parcels greater <br />than five acres, except where flood elevations are <br />significantly impacted. <br /> <br />Policies <br />1. Fencing will be prohibited within the floodway of a <br />watercourse. Open fencing parallel to the flow direction <br />may be allowed within the flood way on a case-by-case <br />basis. <br /> <br />2. Fencing outside the flood way but within the conveyance <br />area of a watercourse will be restricted to the least flow~ <br />restrictive types of open fencing (three-strand "vire, three- <br />board rail, etc.). Chain link, space board fencing, etc., will <br />not be allowed. <br /> <br />3. Fencing outside the conveyance area of a watercourse but <br />within the IOO-year floodplain will be restricted to fencing <br />that allows the passage of ,vater. <br /> <br />FILL IN THE FLOODPLAIN <br />Discussion <br />Reclaiming floodplain by importing fill has the effect of <br />increasing flow dmV11stream. Importing fill into the existing <br />floodplain removes floodplain storage. Water that may <br />have otherwise ponded outside the effective flow area of a <br />watercourse will be forced downstream instead, thereby <br />increasing the flow and water surface elevations <br />downstream. Merely replacing any fill with an offsetting <br />amount of excavation will not ahvays be adequate to <br />