<br />28.
<br />
<br />29.
<br />
<br />30.
<br />
<br />31.
<br />
<br />31.
<br />
<br />33.
<br />
<br />34.
<br />
<br />35.
<br />
<br />35.
<br />
<br />37.
<br />
<br />33.
<br />
<br />39.
<br />
<br />40.
<br />
<br />41.
<br />
<br />41.
<br />
<br />XI1-;l
<br />
<br />APPENOIXA
<br />SCOPEOFIoIQRK
<br />
<br />U.S. En.ironmental Protection Agency, Storm Wdter Management Model,
<br />Version II. Endronmental Research Center, Cincinnati, Ohio.
<br />U.S. loIater Rewurces Council, Guidelines for Determlninq Flood Flow
<br />Frequency, ~ul1etin 117, Mdrch, 1976.
<br />U.S. So11 Conservation Service, Soils Sur.ey of Jefferson County,
<br />ColoradO, U.S. Department of Agriculture, Lakewood, Colorado,
<br />UnputlllShedSoilslnformation, April, 1980.
<br />Urban Drainage and Flooa Control District, MethodologyforEvd luation
<br />ofFeasibilit: Multi urisdictional UrbanllralnaeandFlood
<br />onro raects, nver, oorao, eruary, 9
<br />
<br />Tne pi annlng d~si9rment was oroken down into two part,_ The first part is
<br />the oeveloPl1~nt of alternat ive pi ans, and tne s~cond part is prel iminary
<br />aesign. Tnis report represen~s Phase A wnich is tne develo~ent :)f .It,:,r-
<br />native plans. M outl ine of the scope of wor~ included in Phase A is as
<br />follOWS;
<br />
<br />1. "'=et initially and biweekly with the U!).j,FCD and representatives of the
<br />City of Golden, Jefferson County and Adolph Coors Industries to insure
<br />comp\iance witn the services requirt:d by thls agreement, to obtain and
<br />provide data and gMeral information, and to solicit desires of portici-
<br />pating entities and other interested groups in order to develop alter-
<br />na.tiveplans_
<br />
<br />~ight-McLaughlin Engineers, Urban Storm Drainage Criteria Manual,
<br />Denver Regional CounCil of Governments, Denver, Colorado, 1j69.
<br />~ight-McLaughlin Engineers, ~ater-Based Recreation for Urbanizing
<br />Areas, Framework Document, ~.E. Gates and Associates for Office of
<br />~ater ResearCh and TeChnology, U. S. Department of the Interior,
<br />March, L~80.
<br />~right-McLaughl in Engineers, Lower Clear Creek Master Drainage Plan,
<br />Phase A, Urban Drainage and Flood Control D1strlct, September
<br />1980.
<br />
<br />2. Mainta in contact and 1 ia ison wi tn the Co 10rado State DepartlJlent of Hig~-
<br />ways, tne U.S. Army Corps of Engineers, tne City of Golden Planning
<br />Oep<lrtment, AdulphCoors Industrles anctother pertinent agencies .
<br />
<br />Hammer, Siler, George, Associates, Economic Conditions and Poten-
<br />tials,CityofGolden,ColoraIlO, November 1980.
<br />K~nmer, Siler, George, Associates, A Pro~osed GrOwth and Development
<br />Pl,w, CityofG<Jlden, Colorado, Julle.gSl.
<br />
<br />3_ Stor'l1 drilinagecriteria of the District, Jefferson County and the City
<br />ofGoldenSllallDeutilized_
<br />
<br />4_ Th~ Engineer sholl define drainage problems, flood hazard problens, and
<br />d~age estimates, using t~e hydrology and nydraul its defineo in tne
<br />"Flo<Jd Ha.zard Area Del1nedtion Study" by Ginge.-y ind Associates.
<br />Reference L
<br />
<br />wright.McLaughlin Engineers, Blunn water Treatment Plant, Water
<br />Sl.lpply Master Plan Update for the Clty of Arvada, April 19S1.
<br />loIright_McLaugnl in Engineers, ~ater Faci 1 it ie, for The CHy of Golden,
<br />Master Plan Repcirt, September 1974.
<br />Wright-McLaughlin Engineers, Water Facilities for The City of Golden,
<br />Master Plan Report, August 1980.
<br />McLaughlin Industrial '~astes EngineerS, Colorado Inactive Mine
<br />Drainage, Draft Report.
<br />~ri9ht-McLau9hl in Engineers, City of Northglenn ~ater Treatment
<br />FacilitieS, Predesign Re~rt, July 1978.
<br />American Society of Civil Engineers, Ogeration and Maintenance of
<br />Irrigation ilnd Orilinage Systems, A5E !1inuill No. 57, 1980.
<br />
<br />The En9 ineer Shill I then develop a I ternat i ~ e pI <InS on a reac h- by-re<lch
<br />basis. w~1ch wi 11 el iminate in so t<lr as poss,b I e tne arainage drld f'ooJ
<br />tlazardproblffilsdssociatedwiththcbasin_
<br />
<br />5_ Hydraulic c.alculations shall be made for devel\lpin9 and evaluating the
<br />b~st dl terndtive pl ans as d iscuss~d In nW'.ber 4 abov~.
<br />
|