Laserfiche WebLink
<br />Xl-5 <br /> <br />X!-6 <br /> <br />1. Strengthening of the e~ isting bridge deck tie-down ~y,terns, dnd instal- <br />ling f I otat ion prevent i on ~ ent i ng at the Ford Street dnd Wash i ngton <br />A~ en ue br idges. Toe,e measure, woul d a id against loss of the br idge <br />deck, during a major flood, but would not reduce impact force~ nor pre- <br />vent o.ertopping of the bridges by flood flows. <br /> <br />o Floodproof doorways, garage openings and otner opening~ at vdrious <br />structures along the creek SUCh dstnebre..erybuiloing, the po.."r <br />oui ld ing, the welllless Center, the greennouse, the residence dno tn~ <br />container ouilding. <br />o Install a flo..restrictor at the entrance to the Farmer> Highline <br />Canal conduit to pre.ent surCharge of the canal downstream. <br />o Raise approximately ~OO l.f. of the concrde channel wdll along tne <br />south ,ide of the creek bet..een tne po..er building footbridge dnd <br />the residence. <br />o Remo~e dnd re locate the drop s tructur" dt the fa i1 road br idge n"ar <br />Ml; Intyre Str""t to I a..er the cr"ek i n~ert and a 110.. the 100- yedr <br />flow to remain witnin the channel banKS. <br /> <br />the citi zens of Golden would be gi~en information regarding floOd hazards <br />alongelear Creek. Tnisc<I1lpaigllI<<Culd supplenent the Urban Drainage dnd <br />Flood Control's progr3'll of notification of resiaellce" busillesses, etc. <br />which lie in a flood hazdrd area. <br /> <br />Remedial improvenent~ ~nder tne inter im pI an ...:luld include the fallowing; <br /> <br />2. Install ing a 1 alldscap8d berm along the west side of Mapl e Street bet..~en <br />9th and 10th Streeb would divert initidl av~rflow, ~outnward ta..ard the <br />c~eek. KoO/enr, sub~equent illulldation of the residential il~ea by back. <br />....ater effccts...:lul:1sti1l be possible. AI,Q,thebermcouldbebreilClJed <br />by an e.ent g~eilter than the lOO-year flood. <br /> <br />In addition to the above ~asures, the engineering staff dt Coors IndJstri~s <br />1, re~ i,:win',j the impilc t of lOO.year fload leve 15 on crit ica 1 s tructure~ ilnd <br />eQui iJIlleot. rhe oen~f i ts and costS of th~ ~ ar iOus f1 ood protect ion d Her- <br />nat ives Shall De eva luated by Coors Industries witM r~spect to their loog <br />range goa Is and oDJect i ~ es. In the interim, the consultant recoll'll1<ond, tne <br />"stilblishment of il Flood Emergency Plan by ..hieh persallnel aoa equi~€nt <br />wouldbemooilizedforemeryencyfloadprooflng,deorisre'l\Oval,etc. <br /> <br />J. The con~ul tdllt reCCll...-nends implEl1lentillg uv~rfl ow dnd ri prap protec tion at <br />thH Water Treatment PI <lilt ber;n dQw~stre<<:1 of U.S. 6, due to the critic al <br />nature of the berm, far mainte~ance of an Mequate supply of raw water <br />for the plant. Because toe tlerm is comprised of relati.ely small sized <br />material, it Cdll be expected to be washed out 011 th~ dv.:rage of at least <br />ollCe every 20 years. On thb bilSis the immediate e~peoaiture of funds <br />lntnisareawouldbejustifled. <br /> <br />~~A~H t (TU~KER GULCH TO ~iNTYRE STREET) <br />II/right-l'o::Laughlin Engilleers have identified the following structural mea- <br />,ure~ by which fl ood n~zards may be reduced at spec ific 10Cdt ions along the <br />AdolPh Coors Industries property: <br /> <br />REACH 3 (l>\:.;l~TYRE STREET TO YO:JNGflELC SfREET) <br />TM" consultant', recommendation for this reach i, Floodplilln Reguldtion. <br />Tnis reach is relativelyvacilnt and ulldeveloped, occupied only by salld ano <br />gril~lll Ollerat ions, dn aSima It pl ant,ana Coors Illdu,tries corrrnodit ie, tril~S- <br />load Oiler at ions. rneri!fore, the on ly pract ica 1 alld economi ca 1 a I terllat i ~e <br />is to r"gulatll tne flooaphin anll control future development in this drea. <br />fh..:CO<lSultillltreCorm1endstndttnedrainagewaymaintenanceprogram for thls <br />reach include the monitoring of the Denver '~at"r Department raw ..ater trans- <br />mission conduit crossing and thilt milintenance funoillg include re~lacement of <br />the dumpeo concrete rUDo 1e with r i flrap S;lec if ica I Iy des iglled for lOD- !ea~ <br />flO....dnavelocitycollditio!'s. <br /> <br />o Remo~ e the Cr aO/ford Street tJr idg e. the 1'O""r bu i Id ing foottJr i Gge and <br />the gr<=enllou~e f,-,otb" idg". <br />