My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03947
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03947
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:49 PM
Creation date
10/5/2006 12:12:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Milliken
Stream Name
Local Drainage
Basin
South Platte
Title
Floodplain Information Report
Date
10/1/1982
Prepared For
Milliken
Prepared By
Simons Li & Associates Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9J <br /> <br />" <br /> <br />curb, gutter, and walk, the total estimated coat of concrete streets is $95 <br /> <br />'Uble 25. Cost Eflti""'te for oraina9''' Structur<l" <br />Relative to Street Draina9'e. <br /> <br />per linear foot ($502,000 per ~l<l), excluding any excavation coets. <br />~e cost of additional drainage structures (culvert" and channels) is <br /> <br />presented in Table 25. These costs are based on unit coste ~ound in "1961 <br />Cost Data" by the Colorado Department of Highways. <br /> <br />It".. <br /> <br />Quantity <br /> <br />Un1tCost <br /> <br />TotaICost <br /> <br />Extension of 36-inch <br />CMP W\der Highway 60 <br />at Grace Avenue <br /> <br />36lf <br /> <br />$26.00/lf <br /> <br />$1,000 <br /> <br />Chantlelfromllarriett <br />Avenue-Great western <br />R4ilr~d spur intersection <br />to Irene Avenue <br /> <br />300l! <br /> <br />$15.00/lf <br /> <br />4,500 <br /> <br />Channel frOOl low point <br />on Irenoe Avenue to <br />fire station pond <br /> <br />120 If <br /> <br />$15.00/lf <br /> <br />2.000 <br /> <br />Total Construction Coet <br /> <br />$ 7.500 <br /> <br />Engin..oering and Contingencies <br />(30 percent of construction coste) <br /> <br />2,000 <br /> <br />Legal. Fiscal and Administration <br />(5 percent of construction, engineering and <br />contingenolea, and land coets) <br /> <br />'00 <br /> <br />TOTI>L COST <br /> <br />$10,000 <br /> <br />Annual Cost <br />(SO-year service lite, 7-3/6 percent) <br /> <br />, <br /> <br />.00 <br /> <br />Operation and Maintenance <br /> <br />'"0 <br /> <br />TOTAL ANNUAL COST <br /> <br />, <br /> <br />'"0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.