Laserfiche WebLink
<br />" <br /> <br />" <br /> <br />Tahle 20. Easte.n now Path Alternati"" 3 SW':'''''y of Cost Estimate. <br /> <br />Table 20 continued. <br /> <br />Item <br /> <br />Quantity <br /> <br />UYlitCost <br /> <br />Tot..lCost <br /> <br />Ite", <br /> <br />Quantity <br /> <br />UnitCoet <br /> <br />Totaleoet <br /> <br />union Pacific Railroad pond <br /> <br />LwnpSum <br /> <br />$133,000 <br /> <br />Annual Cost <br />(SO-year servIce life, 7-3/8 percent) <br /> <br />$33.600 <br /> <br />Jack one 48-1nch ReP <br />through embankment <br />(with headwall) <br /> <br />soU' <br /> <br />$240.QOjlf <br /> <br />12,000 <br /> <br />Operation and Maintenance <br /> <br />1.300 <br /> <br />Enlarge ditch ~3t side <br />of Alice Av..n,," <br /> <br />400lf <br /> <br />$ 5.00/lf <br /> <br />2,000 <br /> <br />I <br />I <br />, <br />, <br />, <br />I <br />I <br />1 <br />, <br />I <br />I <br /> <br />TOTIIL ANNU1<L COST <br /> <br />$34,900 <br /> <br />One 4B-inch ReP storm sewer <br /> <br />930lf <br /> <br />$ 83.00/lf <br /> <br />77,000 <br /> <br />Jack one 48-1nch ReF <br />under Highway 60 <br />(with outlet protectlon) <br /> <br />SOlf <br /> <br />S30D.DOjlf <br /> <br />15.000 <br /> <br />One 4S-inch CMP under <br />Il.lic..Avenu"fr<;>to"..."t <br />d.itch to west cl.ltch (with <br />inlet and outlet protectionl <br /> <br />BOlt <br /> <br />$90.00/lt <br /> <br />7,000 <br /> <br />Channel to Thompson <br />and platte Ditch <br /> <br />JOOlf <br /> <br />$lQ.OO/lf <br /> <br />3,000 <br /> <br />Tho~9pon and PI~tte <br />Ditch crossing <br /> <br />, <br /> <br />LwnpSwn <br /> <br />29,000 <br /> <br />Channel from Tho~p9on <br />and Platte Ditch to Big <br />Thompson/liver <br /> <br />3,000 It <br /> <br />S13.00/If <br /> <br />39,000 <br /> <br />'~tal Construction Cost <br /> <br />$317,000 <br /> <br />Engineerin~ and Contingencies <br />(30 p<<rc"nt of co"structionco9tsl <br /> <br />95,000 <br /> <br />Land Acquisition <br />Agricultural (2.6 acres at $4,000 per acre) <br /> <br />10,000 <br /> <br />Legal, Fiscal and Administration <br />(5 percent of construction, engineering and <br />contin~ncies, and land costsl <br /> <br />21,000 <br /> <br />'tlYrALCOST <br /> <br />$443,000 <br />