Laserfiche WebLink
<br />" <br /> <br />" <br /> <br />Table~. One-Hour Rainfall Intensities (inches per hour). <br /> <br />Technical Addendwm. Table 4 lists the p4ra~eter9 used and the range of values <br />selected. Storage-discharge curves for pondinq behind railroad crossinge were <br /> <br /> Recurrence Interval in years <br />Endcf Period <br />(minutes) , '" " ;0 '"' '" <br />, 0.48 0.60 0.73 0.86 0.92 1.19 <br />'" 0.60 0.75 0.91 1.08 1.22 1.50 i <br /> , <br /> I <br />" 0.84 0.98 1.19 1.41 1.54 1.96 i <br /> , <br />" 0.96 1.1) 1.3B 1.63 1.84 2.27 , <br /> i <br /> , <br />" 1.44 1.73 2.11 2.48 2.76 ].47 <br />" 2.76 3,30 4.02 4.75 5.22 6.63 <br />" 3.96 4.80 5.85 6.90 7.68 9.63 <br />" 1.80 2.09 2.55 3.01 3.38 4.20 <br />.- 1.20 1.50 1.83 2.15 2.46 3.!lO <br />" 0.84 0.98 1.19 1.41 1.54 1.96 <br />" 0.60 0.75 0.91 1.0e 1.22 1.50 <br />" 0.48 0.60 0.73 0.86 0.92 1.19 <br /> <br />defined from topographic ~pping and weir flow equations. Flow splite were <br />based on field observation. The ~tailed drainage basin parameters are pre- <br />8ent,,<iintheTechnicalAddendum. <br /> <br />Results of HYdrologic ~alysis <br />Rainfall-runoff data were not available for the Milliken watershed. For <br /> <br />this reason, the results of the Fossil Creek"nd Boxelder Creek studies w..re <br /> <br />used to evaluate and justify the results of this study. The peak dischsrges <br />per square mile from ~lliken and Cooper Slough are similar. The Fossil Creek <br />basin produces higher peak flows per square mile because of Bteeper slop.." and <br />lower infiltration rates than the Millik..n watershed. A oomparison of the <br />stUdy resulte with those of the previous studies i8 presented in the Technioal <br /> <br />Addendwo.. <br /> <br />A summary of th.. peak flows in the Town of Milliken i8 given in Table 5. <br />A detailed description of the methodology used and hydrologic results are <br />given in the Technical Addendum. <br /> <br />HYdraulic Analysis <br />Back'lround <br />AnalyeIe of the hydraulic characteristics of the Town of Killiken was <br /> <br />oonducted to determine th.. water eurface elevation for peak flow" of the 5-, <br />10-,25.,50-, 100-,and500-yearfloode. Thewat",rsurfaceelevatianswere <br />co~uted using the U.S. Army Corps of Engine..rs' HEC-2 w"ter surfaoe profile <br />computer program (reference 9). Cross-seotional dat<> for the Lola Park <br /> <br />Tributary..ndth" Eaatern Flow P..th wer.. provided in HEC-2 for.....tby the town . <br />Minor o<>rrections w"re made to the eross aections based on field Investigation <br />~n~ fto~d ~un~ary delineation. <br />Culvert ~o~tri~a wer~ fie16 measured. Elevations for top of roa~ <br />crossings and downstream and upstream ehannel inverts were surveyed. <br />RougMness coefficients were selected aft",r field investigation and an..lysis of <br />photographs taken Q\lr1n9 flein reconnaissance. <br />