Laserfiche WebLink
<br />JI <br /> <br />1((~~~/cj,,) j / J I <br /> <br />Ait'''' /" . /. <br />. - " . I. _,.--" / / / <br />-,-,~-------- " , ,,-, __pt7'C' /,' '1 <br />#;,; ." i~~~,-:{r:~~~:~':~:(~;~~--=~:-~-r~~:~=;:,) <br />It , y/ ,_ /i~" ,,~-<,.,4,:'()-' <br />e I: "., .m__~ "i"";-~ '. --. I <br />"<<;.,,, J'~'" . ,~ v . I /-~' .y: <br />f .." -. / ~- I <br />/ .J ,', ",. -,,'-,-n79--""". -.(_.< ~ /,,,;~;..,:,, C'" ; <br />/~IJ:,!,~,<"-:~..-tr:' /'l'/r/v,--- t'-/ ~___(/{:.f' <br /> <br />With proper maintenance and operation, the proposed altemative is expected to have a life of in excess <br />of 50-years. Substantial growth in the upstrearn basin, changes in land use, unexpected large sediment <br />deposition, changes in weather patterns, changes in the highway and/or railroad crossings and <br />overgrowth of vegetation in the chalillels could impa<:t the life. For the most part, the impacts are items <br />that can be addressed through on-going maintenance. <br /> <br />5. COST EFFECTIVENESS <br /> <br />1!s.eful Life of Project <br /> <br />Annual Maintenance Cost <br /> <br />Appropriate measures are required to keep the planned facilities in propeT working order. An operation <br />and maintenance plan will be provided as a part of tile design. Basically, the only op(~ration activities <br />required are to put into place any of the required road closure structures. Maintenance will consist of <br />regularly scheduled inspections along with periodic inspections follO'o~;ng flood events. Measures <br />must be taken to prevent irregularities or other conditions from forming in the flood way channels, <br />levees, and other structures which could lead to formation of jams from debris or trash, and/or repair of <br />minor damage. With regards to the natural flow chal1Jlels and widened flood way charnels, the <br />designated Flood Superintendent wiIJ be responsible to be certain that: <br /> <br />· The natura1low flow channel is dear of debris or foreign objects. <br /> <br />· The floodway channel and the natural low flow channd are not being restricted by the disposal of <br />waste materials, building of unauthorized stmctures or other encroachments (induding planting of <br />restricted crops). <br /> <br />· The capacity of the floodway chimnel is not n~duced by formation of large sediment deposits. <br /> <br />· Banks are not being damaged by wave action, wind and rain erosion, and that sloughing of banks is <br /> <br />not occurring. <br /> <br />· Riprap sections are in good condition with no displacement, looseness, or washing, ar,d no removal <br />of material is occurring. <br /> <br />· Approach channels adjacent to the floodway channel are sufficiently clear of obstructions and <br />debris to permit proper functioning of the project. <br /> <br />· The capacity of the floodway channel is not reduced by twes and bmsh. <br /> <br />Immediate steps will be taken to remedy any adverse conditions disclosed by such inspections. <br />Periodic repair and cleaning and the removal of debris and sediment as may be necessary will be <br />completed in a manner as to insure that wetlands grasses in the natural low flow chw1Jlel remain in <br />place. <br /> <br />rII-34 <br />