Laserfiche WebLink
<br />Tabl" 13 <br />Pmliminary Cost Estimate <br />Alternative 1110. 6 <br />Atwood Bypass Channel <br /> <br />Item <br /> <br />---,---- <br />Unit <br /> <br />1, General <br />Mobilization <br />Traffic Control <br />2. Bypass Levee <br />Clearing & Grubbing <br />Remove and Replace Topsoil <br />Earthwork for 8-ft East Levee <br />Earthwork for 8-ft West Levee <br />Seeding and Revegetation <br />Temporary Irrigation <br />3. Low Flow Splitter <br />Seeding and Revegetation <br />4. Railroad Soil Cement <br />5. S, Platte Return Dike <br />Clearing & Grubbing <br />Remove and Replace Topsoil <br />Earthwork for 5-ft Levee <br />Seeding and Revegetation <br />6. Road Closure <br /> <br />Engineering Costs (12%) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition (Channel Easement) <br />Land Acquisition ( Levees) <br /> <br />Lc. <br />-, <br />Lc' <br />-' <br /> <br />- <br /> Quantity Unit Cost <br /> 1 $50,000 <br /> 1 $50,000 <br /> 50 $500 <br /> 80,000 $2 <br /> 268,800 $3 <br /> 113,400 $3 <br /> 63 $3,500 <br /> 1 $10,000 <br /> 50 $500 <br /> 3 $3,500 <br /> 2800 $100 <br /> 7 $500 <br /> 11,100 $2 <br /> 35.000 $3 <br /> 10 $3,500 <br /> _~J $10,000 <br /> <br />AC <br />CY <br />CY <br />CY <br />AC <br />LS <br />CY <br />AC <br />CY <br /> <br />AC <br />CY <br />CY <br />AC <br />LS <br /> <br />Subtotal <br />15% Contingency <br /> <br />Subtotal Construction Cost <br /> <br />$2ll7,155 <br />$123,815 <br />750 $375,000 <br />50 $1:15,000 <br /> <br />AC <br />AC <br /> <br />$500 <br />$2,500 <br /> <br />Total Project Cost <br /> <br />Cost <br /> <br />$50,000 <br />$50,000 <br /> <br />$25,000 <br />$160,000 <br />$806,400 <br />$340.200 <br />$220,500 <br />$'10,000 <br />$:15,000 <br />$'10,500 <br />$280,000 <br /> <br />$3,!;00 <br />$n,200 <br />$105,000 <br />$215,000 <br />$10,000 <br /> <br />$2, '153,300 <br />_ $322,995_ <br /> <br />$2,476,295 <br /> <br />$3,2i97,265 <br />