My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03928
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:46 PM
Creation date
10/5/2006 12:11:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Pawnee Creek
Basin
South Platte
Title
Flood Hazard Mitigation Feasibility Study
Date
2/1/1998
Prepared For
Logan County
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />After extensive analysis, a multitude of presentations to the public, and several revisions of the design <br />ekments, Alternative No.5 was selected as the preferred solution. PIimary reasons for selection of this <br />alternative included: <br /> <br />· Partial protection of Town of Atwood <br />· Best use of existing Pawnee Creek Channel <br />· Best level of protection for Sterling <br />· Partial protection of fannlands bordering HWt' 6 <br /> <br />In general, it makes the most sense to construct drainage improvements from downstrearn to upstream. <br />The selected Pawnee Creek project is no exception because upstream improvements will increase flows <br />in the lower reaches. If improvements have not been completed in the lower reaches to properly <br />convey the increased discharges, then flooding conditions can be made worse. Therefore, it is <br />recommended that the Pawnee Creek project be constmcted starting downstream. If funds are not <br />available to complete the entire project at one tjme, then the project can separated into the following <br />phases and constructed in the following order: <br /> <br />I. Riverside Cemetery Construction <br />2. Channel and Levees downstrearrl of UPRR <br />3. Pawnee Creek mainstem bridges for HWY 6 <br />4. Box culverts under UPRR embankment at Town of Atwood <br />5. Channel cleaning and debris removal upstre:am, ofHWY 6 mainstem bridges <br /> <br />III-I 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.