Laserfiche WebLink
<br />GENERAL INST ALLA TION OF STRAW BALES <br />1.X2. STAKE OR <br />1.X1. STAKE <br />WEDGE LOOSE.STRAW <br />BETWEEN BALES <br /> <br />BALES MUST BE TIGHTLY <br />ABUTTING WITH NO GAPS <br /> <br /> <br />4. MIN. <br /> <br /> <br />IElIElI~" <br />-jIElIE=l'~ <br />'II- <br /> <br />1. EXCAVATE THE TRENCH <br /> <br />2. PLACE AND STAKE STRAW BALES <br /> <br />BACKFILL MATERIAL <br />fROM TRENCH <br /> <br /> <br />3. BACKFILL AND COMPACT EXCAVATED SOIL <br /> <br />I.XZ" WOOD STAKE <br />(OR t"Xn <br /> <br /> <br />STAKED AND ENTRENCHED <br />50 LB. (APPROXIMATE) <br />STRAW BALE <br /> <br />COMPACTED SOIL TO <br />PREVENT PIPING <br />SEDIMENT LADEN RUNOFF <br /> <br />1131 <br />'~M:Tf~II~1 _ I 4"(MIN')mTI <br />'3ISIEIISIEIII?6-(MIN])SISISI ISIr <br />T <br />CROSS-SECTION OF A PROPERLY INSTALLED STRAW BALE <br /> <br />Fi2Ure 4 <br />