My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03909
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:42 PM
Creation date
10/5/2006 12:11:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Denver International Airport
Stream Name
Boxelder Creek
Basin
South Platte
Title
Hydrology Studies on New Airport in the Boxelder Creek Watershed
Date
11/1/1988
Prepared For
Denver Airport Planning Office
Prepared By
Kiowa Engineering Corporation
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />J <br /> <br />I. INTRODUCTION <br />A. Authorization <br />This hydrologic analysis on the New Airport in the Box Elder Creek <br />Watershed Study was performed by Kiowa Engineering Corporation (Kiowa) under <br />contract with the Urban Drainage and Flood Control District (UDFCD). <br />Specifically, work was completed under Agreement No. 87-09.03C dated July 19, <br />1988. The study sponsor in addition to UDFCD was the Denver New Airport <br />Planning Office. <br /> <br />B. Purpose and Scope <br />The purpose of the study is to establish baseline hydrologic information <br />for existing and future conditions. The futur~ condition was established for <br />future development with the proposed New Denver Airport. <br />Specific study tasks were as follows: <br />1. Collect information from the sponsors and interested parties. <br /> <br />2. Define basins and sub-basins boundaries. <br /> <br />3. Develop sub-basin runoff hydrographs for the 2-, 5-, 10-, and 100-year <br />storm for existin9 development, and future development for the Box Elder <br />Watershed Tributary within the New Denver Airport. <br /> <br />4. Route and combine the sub-basin hydrographs to develop peak flows at the <br />des i gn poi nts. <br /> <br />5. Reconc il e any differences in flood pea ks between th is Study and other <br />studies desi9nated by the State of Colorado or published by the UDFCD. <br /> <br />6. Submit a report summarizing the results of the study. <br /> <br />7. Submit supporting calculations and data to the UDFCD. <br /> <br />C. Acknowledgments <br />We wish to acknowledge the following individuals for their guidance and <br />contributions during the course of this study. <br /> <br />~lr. Ben Urbonas <br /> <br />Urban Drainage and Flood Control <br />District <br /> <br />Mr. Norm Witteveen <br /> <br />Greiner/MKE Airport Team <br /> <br />Hr. Don Smith <br /> <br />Denver New Airport Planning Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.