My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03909
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:42 PM
Creation date
10/5/2006 12:11:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Denver International Airport
Stream Name
Boxelder Creek
Basin
South Platte
Title
Hydrology Studies on New Airport in the Boxelder Creek Watershed
Date
11/1/1988
Prepared For
Denver Airport Planning Office
Prepared By
Kiowa Engineering Corporation
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />11776 So. .Jackson Street <br /> <br />Kiowa Engineering Corporation <br /> <br />November 17, 1988 <br /> <br />t4r. Ben Urbonas <br />Urban Drainage and Flood Control District <br />2480 West 26th Avenue, Suite 156-B <br />Denver, Colorado 80211 <br /> <br />RE: <br /> <br />Hydrology Studies on the New Airport in the Box Elder Creek <br />Watershed (KIOWA Project No. 87.12.15.C) <br /> <br />Dear Ben: <br /> <br />The final Hydrol09Y Report accompanies this letter. This report has <br />been prepared for the Denver New Airport Planning Office, and the <br />Urban Drainage and Flood Control District. <br /> <br />Hydrologic analysis was performed for the Box Elder Creek Watershed <br />Tributary to and within the New Denver Airport. The procedures used <br />and results of the hydrologic analysis are presented in the report. <br />The flood pea ks and volumes are defi ned for the 2-, 5-, 10-, and <br />100-year recurrence intervals for existing and future development con- <br />ditions. <br /> <br />Submittal of the final Hydrology Report concludes this study. <br /> <br />We appreciate this opportunity to provide engineering service to the <br />District and the Denver New Airport Planning Office, and look forward <br />to working with you again. <br /> <br />Si ncerely, <br /> <br />JYC/rms <br />D4/ R15 <br /> <br />KIOWA ENGINEERING CORPORATION <br /> <br />~YH- eh <br />J~ Y. Chan:,~ <br /> <br />Principal I <br /> <br />Enclosure <br />Office) and <br />District) <br /> <br />Report (10 copies to the New Denver Airport Planning <br />(15 copies to the Urban Drainage and Flood Control <br /> <br />Suite 1001 <br /> <br />Denver, Colorado 80210-3808 <br /> <br />(303) 682-0368 <br />
The URL can be used to link to this page
Your browser does not support the video tag.