Laserfiche WebLink
<br />'I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />MISSOURI RIVER BANK STABILIZATION AND NAVIGATION <br />FISH AND WILDLIFE MITIGATION PROJECT <br />DEFINITE PROJECT REPORT <br />WITH <br />INTEGRATED ENVIRONMENTAL ASSESSMENT <br />AND SECTION 404(b)(1) EVALUATION <br /> <br />CALIFORNIA BEND HABITAT RESTORATION/PRESERVATION PROJECT <br /> <br />1. INTRODUCTION <br /> <br />a. Purpose: The purpose of this report is to present a detailed proposal for the <br />restoration/preservation of terrestrial and aquatic habitat along the Missouri River at California <br />Bend in Harrison County, Iowa. This Definite Project Report (DPR) provides planning, <br />engineering, and sufficient construction details for the selected plan to allow final design and <br />construction to proceed subsequent to approval of this document. The report also addresses the <br />requirements of pertinent environmental regulations, such as the National Environmental Policy <br />Act (NEPA) of 1969 as amended, the Council on Environmental Quality (CEQ) Regulations for <br />Implementing the Procedural Provisions of NEPA, the Federal Endangered Species Act of 1973 <br />as amended, the National Historic Preservation Act of 1966 as amended, and Section 404(b)(1) <br />of the Clean Water Act of 1986. <br /> <br />b. Authority: The Missouri River Bank Stabilization and Navigation Fish and Wildlife <br />Mitigation Project, Missouri, Kansas, Iowa, and Nebraska was authorized by Section 601(a) of <br />the Water Resources Development Act of 1986 (Public Law 99-662). Title VI of the Water <br />Resources Development Act of 1986 authorized the mitigation project in accordance with the <br />plans and subject to the conditions recommended in the "Missouri River Stabilization and <br />Navigation Project Final Feasibility Report and Final Environmental Impact Statement (EIS) for <br />the Fish and Wildlife Mitigation Plan" (U.S. Army Corps of Engineers 1981). The goal of the <br />mitigation project is to restore, preserve, and develop 18,200 acres of existing public lands and <br />to acquire and develop 29,900 acres of nonpublic land. A total of 48,100 acres of land in the <br />four affected States would be acquired, restored, preserved, and developed for the mitigation <br />project. Allocation of the acreages by the affected states are presented in the report entitled <br />"Missouri River Bank Stabilization and Navigation Fish and Wildlife Mitigation Project, <br />Reaffirmation Report" (U.S. Army Corps of Engineers 1990) as presented in Table 1. <br /> <br />c. Previous Reports: The following reports previously prepared are pertinent to the <br />California Bend Definite Project Report: <br /> <br />(1) U.S. Army Corps of Engineers, Missouri River Division. 1981. Missouri <br />River Bank Stabilization and Navigation Project, Final Feasibility Report <br />and Final EIS for the Fish and Wildlife Mitigation Plan. <br /> <br />I <br />