Laserfiche WebLink
<br />, <br /> <br />2 <br /> <br />, <br /> <br />Location <br /> <br />Existing BFE Modified BFE <br />(feet)* (feet)* <br />6,390 6,390 <br /> ~ <br />6,422 6,426 <br />6,527** 6..527 <br /> <br />Just upstream of Colorado and <br />Eastern Railroad <br />Approximately 2,500 feet upstream <br />of Colorado and Eastern <br />Rail road <br />Approximately 3,000 feet upstream <br />of North Carefree Circle <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />**Prior to channel improvements, this distance was approximately 10,900 feet <br />upstream of the Colorado and Eastern Railroad. <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildinga '.. and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the conununity, that the Mitigation Dire'cto'rate <br /> <br />reconsider the determination. Any request for reconsideration must be based, <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day period elapses, the <br /> <br />Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br />