My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03844
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:44:31 PM
Creation date
10/5/2006 12:07:54 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Jefferson County
Stream Name
Elk Creek
Basin
South Platte
Title
LOMR - Affected Panel 080087 0430 B, 080087 0440 B - Case No. 94-08-141P
Date
11/2/1994
Prepared For
Jefferson County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />2 <br /> <br />Approximately 40 feet downstream of <br />culvert located approximately 5,100 <br />feet upstream of South Elk Creek Road <br />Just upstream of culvert located <br />approximately 5,100 feet upstream of <br />South Elk Creek Road <br />Approximately 6,170 feet upstream of <br />South Elk Creek Road <br /> <br />7,132 <br /> <br />7,130 <br /> <br />7,133 <br /> <br />7,135 <br /> <br />7,154 <br /> <br />7,154 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildings and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the community, that the Mitigation Directorate <br /> <br />reconsider the determination. Any request for reconsideration must be based <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day period elapses, the <br /> <br />Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br /> <br />Any person having knowledge or wishing to comment on these changes <br /> <br />should immediately notify: <br /> <br />The Honorable Betty J. Miller <br />Chairperson, Jefferson County Board <br />of Commissioners <br />100 Jefferson County Parkway <br />Golden, Colorado 80419 <br />
The URL can be used to link to this page
Your browser does not support the video tag.