Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />FLOODPLAIN MANAGEMENT <br /> <br />Local Ordinance Reouirements <br />Communities that manage their floodplains in Colorado do so most often through the local <br />regulatory process. This requires a community to adopt an ordinance or regulation, which sets <br />forth the performance standards by which development will occur in identified flood hazard <br />areas, Nationwide and in Colorado, regulations are enforced within the area of the lOO-year <br />floodplain. <br /> <br />The basic requirement of these regulations is that new development and significant improvement <br />of existing development cannot occur in the 100-year floodplain without a floodplain <br />development permit being obtained. Obtaining such a permit requires compliance with <br />engineering standards. In communities that have only approximate floodplain information, the <br />engineering standards have been more general. Structures must be built with materials and <br />techniques that "minimize flood damages". For communities that have detailed floodplain <br />information, more specific regulations would apply. <br /> <br />Flood Insurance <br />Hood insurance is made available to owners and occupants of floodprone property through the <br />federal government's National Flood Insurance Program (NAP). The federally backed flood <br />insurance is available to anyone in any community that participates in the NAP. At the time of <br />this HA, unincorporated EI Paso County and the eight incorporated communities covered by the <br />1999 FrS were all participants in the NAP. The dates on which these communities officially <br />joined the regular program of the NAP are provided in Table 4. <br /> <br />a e . ommunuy ar IClpa Ion III <br />Community Date Entered into NFIP <br />El Paso County (Unincorporated) Dec 18, 1986 <br />Town of Calhan Mar 18,1986 <br />City of Colorado Springs Dec 18, 1986 <br />City of Fountain Jun 5, 1985 <br />Town of Green Mountain Falls Jun 5, 1985 <br />City of Manitou Springs Feb I, 1984 <br />Town of Monument Dec 18, 1986 <br />Town of Palmer Lake Jun 3, 1978 <br />Town of Ramah Aug 5, 1986 <br /> <br />T bl 4 C <br /> <br />'t P f' f 'NFIP <br /> <br />Communities become participants by adopting floodplain regulations, adopting an NAP map (if <br />one exists) and agreeing to cooperate with the federal government in the local implementation of <br />the NFIP. Property owners and occupants can then contact an insurance agent familiar with the <br />NAP (perhaps their own agent) and purchase insurance through that agent, much like they would <br />purchase homeowner's insurance. Brochures and other information regarding the National Flood <br /> <br />19 <br />