My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03677
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03677
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:57 PM
Creation date
10/4/2006 11:56:06 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Fort Collins
Stream Name
Dry Creek
Basin
South Platte
Title
Major Drainageway Planning Dry Creek Technical Addendum
Date
4/1/1980
Prepared For
Larimer County
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />STUDY SCOPE <br /> <br />11 <br />I <br />~I <br /> <br />This hydrologic analysis was prepared as part of the "Master <br /> <br />Drainageway Planning Study for Dry Creek in Fort Collins and <br /> <br />II <br />11 <br />il <br /> <br />Larimer County, Colorado". This analysis was completed <br /> <br />according to the Scope of Work entitled, "Feasibility Study <br /> <br />for a Flood Control and Drainage Plan for Dry Creek, Fort <br /> <br />Collins, Larimer County, Colorado" (Reference 1). <br /> <br />II <br />I <br />:1 <br />,I <br />II <br />. <br />! <br />II <br /> <br />, <br />, <br />~I <br />,I <br />II <br />1. <br />I <br />II <br />I <br />II <br /> <br />This Scope of Work requires an analysis to determine runoff <br /> <br />rates and volumes for the 2-year, S-year, lO-year, 50-year, <br /> <br />lOO-year and SOD-year flood frequencies for selected basin <br /> <br />conditions using basin growth projections for planning and <br /> <br />zoning maps of local governments. The hydrology determined <br /> <br />in this study will be used to develop a flood plain analysis <br /> <br />that, in turn, will be used in developing depth-damage curves <br /> <br />for the study reach. These depth-damage curves will serve as <br /> <br />the basis for evaluating the benefit:cost ratio information <br /> <br />for proposed improvements. <br /> <br />The intent of the "~!aj or Drainageway Planning Study for Dry <br /> <br />Creek" is to identify the most cost-beneficial solution to <br /> <br />flood control and drainage improvements on Dry Creek. For <br /> <br />projects such as this, where the possibility of large capital <br /> <br />^ ..}' <br />. I' ,j <br />"~""'~:',r.t. <br />
The URL can be used to link to this page
Your browser does not support the video tag.