My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03627
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 11:52:30 AM
Creation date
10/4/2006 11:54:37 PM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Basin
Arkansas
Title
Floodplain Information Report City of Las Animas
Date
7/1/1994
Prepared For
Las Animas
Prepared By
CWCB
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />the potential problem. Although significant freeboard wa~ built into the north cmd south levees <br />upstream of both bridges the problem should be addressed. <br /> <br />The second effect is the reduction of grade for interior drainage. Some interior drainage <br />outfall channels have of necessity been rerouted to obtain grade to the river. <br /> <br />Streambank Erosion Along the Arkansas River <br /> <br />The Arkansas River has eroded suffficiently to reach the toe of the south bank levee at <br />the west end of the Project several times since constmction. The District has successfully <br />repaired the damage and restored the levee toe. <br /> <br />This problem reoccurred during June 1994 when the river eroded into the toe of the levee <br />approximately 1/2 mile from the beginning of the levee west of Las Animas. Some of the jacks <br />installed for levee protection were washed out. The District is fighting this streambank erosion <br />and has restored the levee toe but another section downstream is being threatened. A large scale, <br />vigorous program of streambank stabilization and levee toe protection will be necessary to <br />maintain the integrity of the levee at the critically important west end. <br /> <br />A separate erosion problem has developed at the west end of the Pn~iect where the <br />Consolidated Canal river return outlet channel has eroded into the toe of the levee. This problem <br />should also be addressed in a vigorous manner to maintain the integrity of the levee. <br /> <br />These major needs for streambank and levee protection to maintain the integrity of the <br />Project are clearly beyond the financial capability of the District. <br /> <br />FLOOD CONTROL PROJECT <br /> <br />Proiect Description <br /> <br />Because of the history of floods and potential of future floods, officials from the City of <br />Las Animas, Bent County, and the Arkansas River Conservancy District requested that the Corps <br />investigate and recommend a course of action to alleviate flood problems at Las Animas. <br />Subsequent Corps investigations and studies resulkd in the construction of the Las Animas Flood <br />Control Project (Project) which was completed June 17, 1978. The Project's general features are <br />shown on Figure I (Plate I, titled Las Animas Flood Control Project, dated August ] 978 from <br />the Corps' February 1979 Operation and Maintenance Manual). <br /> <br />The Project consists of the following features: <br /> <br />* A right bank levee (the main levee) 9.35 miles long on the south bank of the Arkansas <br />River protects the City and adjoining agricultural lands; <br /> <br />* A left bank levee 1.02 miles long on the north bank of the Arkansas River protects a <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.