Laserfiche WebLink
<br />" <br /> <br />0.....i....... <br />\: .) <br />G.",) <br />,.-., <br />.,:/' <br /> <br />~ <br />~! <br /> <br />tJf!X <br />~ <br />a;;~ <br />~. <br />~ C!) <br />, <br />~ (;3 <br />@ <br /> <br />.. Q> <br />~ <br />.C <br />. <br /> <br />"c..., <br />'i <br />. <br />.' <br />i <br />i f?'.....,' <br />I '-9' <br />t(Q <br />R \Y' <br /> <br />f.?~ <br />'(li <br /> <br />1 r-:. <br />}"- <br />~ <br />;C. <br />., <br />, <br />c- <br />ie. <br /> <br />L <br />L <br />L <br /> <br />Proc. <br /> <br /> <br />No.: W-G-1 <br /> <br />Date: <br /> <br />June 1979 <br /> <br />Item: <br /> <br />,~r;:;l~~W~1m~. <br />WESTERN DIVISION OPERATIONS PROCEDURES MANUA~~..r."Jltl:')~-"::1-~_':cl.' \. ~ <br />. HII, C) i "', ,\1 <br />WATER OPERATIONAL PROCEDURES \\', H.'~,.. ~ ~..~,f <br />~~.-;-:';;C;I;y;nW All}: <br />'. .1\11'. ,,"- '\0) <br />\.., ~ '- . "I"'l'(~\\' ['1.,\;" <br />OPERATION OF LAKE GRANBY RESERVOIR c:.:.. .'> ~. <br /> <br />Procedures: <br /> <br />Releases from Lake Granby to the Colorado River generally will be <br />limited to the amount required by the Secretarial Determination dated <br />January 19, 1961. Unless advised to the contrary, the release from <br />Lake Granby will be 20 ft3/s from October 1 through April.30, meas- <br />ured at the gage immediately below Granby Dam. Minimum required <br />releases during the May 1 - September 30 period are based on maintain- <br />ing certain discharges at the gaging atation below the Coffee-McQueary <br />Ditch, but are ~ubject to adjustment based on forecasted inflows, The <br />minimum required flow will be furnished operating personnel by the <br />Water Scheduling Division, Changes in the miniu.um required releases <br />are specified at the end of the month. To avoid unnecessary overtime, <br />changes will be made on Friday if the end of the month is Saturday, and <br />on ~bnday if the end of the month is Sunday. <br /> <br />Releases through the spillway will normally be scheduled by the <br />Water Scheduling Division,. In the absence of specific instructions, <br />bypass of water in excess of fish requirements ~Qall be made when the <br />waler' surface elevation of Lake Granby reaches/Bt79.5-. Releases will <br />be made to maintain the elevation by releases through the 30-inch <br />hollow-jet valve up to the capacity of the valve before raising the <br />spillway gates, The rate of increasing releases through the valve <br />and warning downstream inhabitants will be at the discretion of the <br />Chief, West Slope Area Branch. <br /> <br />If Lake Granby water surface continues to rise after the 30-inch <br />valve is completely open, both spillway gates will be raised .1 foot. <br />This will increase the outflow from about 430 ft3/s to 530 ft3/s. <br />The spillway gates will be raised in ,1-foot intervals with each <br />,1-foot rise in water surface elevation to prevent overtopping the <br />gates.. When the water surface elevation reaches 8280, the gates will <br />be raised as required to prevent exceeding this elevation. <br /> <br />The water surface must not be permitted to exceed 8280,3 feet to <br />prevent damage to property abutting on Lake Granby. . As inflow recedes, <br />the gates will not be lowered until the water surface elevation <br /> <br />EXHIBIT 27 <br />