My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03543
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:35 PM
Creation date
10/4/2006 11:50:36 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Easement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />T~CHNICA~ M~MORANDQM <br /> <br />TO: <br /> <br />David Walker, CWCB <br /> <br />FROM: <br /> <br />Wright Water Engineers <br /> <br />DATE: <br />SUBJECT: <br /> <br />August 22, 1988 <br /> <br />Union Avenue Boat Chute <br /> <br />At the concluslon of the UnJon Avenue boat chute meeting on August 22, 1988 <br />held in the offices of the city of Sheridan, the following consensus was <br />reached: <br /> <br />1) Resolved that Wright Water Engineers is to proceed with Alternate 2A <br />with a modified first drop similar to that shown in Alternate 4. <br />including engineering modifications necessary for optimization. <br /> <br />Further, it was the consensus that time is of the essence and therefore <br />Wright Water Engineers should commence contacts with the U.S. Bureau of <br />Reclamation and commence designing the model emphasizing the Englewood <br />water intake facility, the U. S. Army Corps of Engineers concrete dam. <br />the first pool, and the first drop which is the same for all alternates <br />considered. <br /> <br />2) Wright Water Engineers stated that this 8/22/88 mid-course correction <br />meeting was too early to discuss cost estimates because layout <br />optimization was needed and that WWE is awaiting unit cost prices from <br />a recent similar job in Boulder. <br /> <br />The group expressed a desire for relative cost, therefore. WWE USing <br />Alternate 2 as a basis of 1.0 provided relative values which range from <br />1.0 to 1.8. <br /> <br />3) Mr. Urbonas indicated a desire for boat chute modifications which would <br />provide connections between drops, with a reference to Alternate 1. <br /> <br />4) Mr. Walker will contact WWE regarding a model allowance. which was <br />estimated at $25,000. taking into consideration the desire of the USBR <br />to participate in this kind of endeavor. <br /> <br /> <br /> <br />U <br />2 <br />- <br /> <br />t <br />w <br />w <br />2 <br />i5 <br />2 <br />w <br />IE <br />~ <br />~ <br />~ <br />I <br />!2 <br />IE <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.