My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03525
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03525
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:32 PM
Creation date
10/4/2006 11:50:16 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
na
Basin
Statewide
Title
Procedures for Compliance with Floodway Regulations
Date
5/1/1990
Prepared For
State of Pennsylvania
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. A plan view of the proposed development must be furnished for all <br />proposed floodway development. The plan view must show the dimensions <br />and location of the proposed change in relationship to the stream and other <br />physical features. The geometry ofthe proposed fill or excavation should be <br />shown on the valley cross sedion so that compensati ng conveyance <br />parameters can be reviewed. <br /> <br />2. Before and after cross-sed ions, plotted on graph paper. <br /> <br />3. Photographs of the site, upstream and downstream conditions, and of <br />unique features that may affed the water surface profile must be provided. <br /> <br />4. Copy of current regulatory Flood Boundary Floodway Map, (FBFM) <br />showing existing conditions, proposed development and revised f100dway <br />limits. <br /> <br />5. Copies of the printout for the original computer models representing <br />both the 1 DO-year and subsequent floodway determination runs which were <br />used to develop the present effedive floodway. The printouts must include <br />full input and output listings. <br /> <br />6. Copy of the printout from the hydraulic computer model representing <br />the revised 1 DO-year profile. The model should include any channel <br />modifications, fill or encroachments that have occurred in the floodplain since <br />the original floodway was deli neated. <br /> <br />7. Copy of the printout from the hydraulic model representing the floodway <br />run for the proposed floodway, including channel modifications and <br />encroachments since the original floodway was established. The equal <br />conveyance reduction method should be used to compute the revised f1ood- <br />way limits unless agreements have been made with affected property owners <br />to utilize a different method. The printout must include full input and output <br />listings with all input changes from the original model highlighted. <br /> <br />8. A copy of the revised Floodway Data Table representing data for the <br />proposed floodway configuration. <br /> <br />9. A copy of the presently effedive F8FM showing the existing floodway <br />and one copy showing the proposed f100dway configurations. <br /> <br />10. Certification from a professional engineer that the physical parameters <br />used in the proposed f100dway delineation represent actual conditions. <br /> <br />11. If the basis for the proposed floodway is a channel modification, the <br />completion of a dam, or any other structural measure, evidence is required to <br />demonstrate the design is adequate and maintenance and operations <br />provision, where applicable, are provided. The submittal must indicate what <br />entity has maintenance responsibility and how it will be performed. If <br />maintenance is to be provided by agencies other than the commun ity, a legal <br />provision for community monitoring and back-up assistance is required. <br /> <br />12. Documentation of approval of the proposed floodway revis <br />the appropriate state agency for communities where the state regu <br />floodway. <br /> <br />7-3 FEMA Response To Floodway Revision Requests. FEMA is <br />to review all community requests for floodway map revisions. yo, <br />revision is considered to be significant, FEMA will revise floodway n <br />distribute them to recognized users. FEMA will respond to a request <br />community for a floodway revision by one of the following means: <br /> <br />1. Reprinting the affeded panels of the Flood Boundary and F <br />Map with the corresponding revised dates. The panels will be acco <br />by a revised index panel showing the most up-to-date floodwa <br />maintained at FEMA. Copies of the revised floodway panels will b <br />previous recipients of the floodway maps. A revised Flood Insuran <br />report will accompany the floodway maps. Included in the report <br />description of the revision and revised Floodway Data Tables. <br /> <br />2. Revising the Flood 80undary and Floodway Map, but without <br />ate reprinting FEMA will send one copy of the Flood Boundary and F <br />Map designating the approved floodway revision to the communi <br />letter of map revision (LOMR) stating that the review of the submitted <br />has resulted in the determination that the FEMA minimum requiremf <br />been met but a reprinting of the Flood Boundary and Floodway M <br />warranted at this time. The material will be filed for incorporation <br />time into a floodway map revision. The approved Flood Bounc <br />Floodway Map revision copies will be dated. Since it is possible th <br />has previously responded to a f100dway revision request in this ma <br />Flood Insurance Study users are encouraged to contad the communi <br />proceeding with plans for development within f100dway fringe ar <br />ways. <br /> <br />3. Send a letter to the community stating that the submittal m <br />incomplete and/or that the revised flooway does not meet FEMA n <br />criteria. <br /> <br />7-4 Submittal of Material. The material requesting revisions to f <br />areas must be submitted by the community to the appropriate FEMA <br />Office. The Regional Office will review the material for completenes: <br />with the proposed changes, approve any maintenance ordinances, <br />ward the necessary material to the FEMA Central Office. <br /> <br />The FEMA Central Office will review the hydrologic and ~ <br />materials, engineering design, and any plans of operations and mail <br />(where appropriate), request additional revisions or corredions as nl <br />then respond to the community by mneans of the appropriate adior <br />in Sedion 7-3. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.