My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03518
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:31 PM
Creation date
10/4/2006 11:49:35 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Onawa, Iowa
Basin
Statewide
Title
Proposal Schedule Summary
Date
1/1/1991
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONCRETE - Contmned <br /> Qty. Unit Material Labor Equipment Ma terial Labor Equipment TOTAL <br /> Unit Unit Unit Total Total Total <br />Discharge <br />Base Slab 7.61 Cy. 64.50 490.85 0.00 0.00 490.85 <br />Water Stop 68.99 Lf 1.95 2.00 134.53 137.98 0.00 272.5 I <br />Steel Strap 25.12 Lf 1.00 0.75 25.12 18.84 0.00 4t96 <br />30 Lb Felt 25.12 Lf 0.25 0.25 6.28 6.28 0.00 1256 <br />If2" EJ. 25.12 Lf 0.25 0.25 6.28 6.28 0.00 1256 <br />FS Slab 84.74 SFa 150 5.00 127.11 423.70 0.00 550.81 <br />Pour Slab 8.00 Hr. 28.22 0.00 225.76 0.00 2ll.76 <br />Inbeds 4.00 Hr. 32.15 0.00 128.60 0.00 1:zg.6O <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 64:1.00 <br />Pump 7.61 Cy. 2.25 0.00 0.00 17.12 11.12 <br />Walls 2.58 Cy. 64.50 166.41 0.00 0.00 166.41 <br />FS WaU 228.27 SFa 1.10 1.68 25 1.10 383.49 0.00 63459 <br />PourWaU 24.00 Hr. 28.22 0.00 677.28 0.00 671.28 <br />Pump 8.00 Hr. 107.00 0.00 0.00 856.00 856.00 <br />Pump 18.10 Cy. 2.25 0.00 0.00 40.73 MI.73 <br />Top Slab 2.59 Cy. 64.50 167.06 0.00 0.00 161.06 <br />FS Elevated Slab 27.91 Hr. 150 32.15 41.87 897.31 0.00 I 93~.17 <br />Pour Slab 8.00 Hr. 28.22 0.00 225.76 0.00 2ll.76 <br />Inbeds 6.00 Hr. 32.15 0.00 192.90 0.00 19:2.90 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 64:2.00 <br />Pump 2.39 Cy. 2.25 0.00 0.00 5.38 ~_18 <br />Flume 9.33 Cy 64.50 601.79 0.00 0.00 601.79 <br />FS WaU 72.00 SFa 1.10 1.68 79.20 120.96 0.00 2()(J.16 <br />PourWaU 16.00 Hr. 32.15 0.00 514.40 0.00 514.40 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 64:2.00 <br />Pump 9.11 Cy. 2.25 0.00 0.00 2050 21150 <br />Cut off WaU 2.05 Cy. 6450 132.23 0.00 0.00 132.23 <br />Water Stop 12.00 Lf 1.95 2.00 23.40 24.00 0.00 41.40 <br />Crumb Footing 2.00 Hr. 25.86 0.00 51.72 0.00 51.72 <br />FS WaU 102.64 SFa 1.10 1.68 112.90 172.44 0.00 28~.34 <br />Pour Slab 8.00 Hr. 28.22 0.00 225.76 0.00 2ll.76 <br />Inbeds 2.00 Hr. 32.15 0.00 64.30 0.00 64.30 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 64:2.00 <br />Pump 2.05 Cy. 2.25 0.00 0.00 4.61 4.61 <br />TOTAL PUMP FAClUTY 8,772.43 12,132.95 7,494.16 28,399.54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.