Laserfiche WebLink
<br />PROPOSAL SCHEDULE <br />ITEM 10 RIPRAP <br /> <br />I SUMMARY SHEBT <br /> <br />01Y UOM <br />1,030.00 TON <br /> <br />DESCRIPTION <br />Riprap <br />TOTAL ITEM 10 <br /> <br />DIRECf UNIT COST <br />38,655.90 37.53 <br />38,655.90 <br />