Laserfiche WebLink
<br />PROPOSAL SCHEDULE <br /> <br />ITEM 7. <br /> <br />EROSION CONTROL BLANKET <br /> <br />1 SUMMARY SUBET <br /> <br />DESCRIPTION <br /> <br />DIRECf UNIT COST <br /> <br />Erosion Control Blanket <br />Excavation I Backf"ill <br /> <br />TOTAL ITEM 7 <br /> <br />01Y <br /> <br />5,775.00 LS <br />5,775.00 LS <br /> <br />UOM <br /> <br />13,757.34 <br />5,100.00 <br /> <br />18,85734 <br /> <br />2.38 <br />0.88 <br />