Laserfiche WebLink
<br />PROPOSAL SCHEDULE <br /> <br />ITEM 6. <br /> <br />EROSION CONTROLUNER <br /> <br />I SUMMARY SUBBT <br /> <br />I <br /> <br />DESCRlmON <br /> <br />DIRECf UNIT COST <br /> <br />Erosion Control Liner <br />Excavation <br /> <br />TOTAL ITEM 6 <br /> <br />01Y <br /> <br />6,040.00 CY <br />6,040.00 CY <br /> <br />UOM <br /> <br />28,465.66 <br />5,600.00 <br /> <br />34,065.66 <br /> <br />4.71 <br />0.93 <br />