Laserfiche WebLink
<br />PROPOSAL SCHEDULE <br /> <br />ITEM I. <br /> <br />Entire work, complete, <br />e][cladiD& items <br />listed below. <br /> <br />ISUMMARY SHEET <br /> <br />DESCRIPTION Q1Y UOM DIRECT <br />GENERAL REQUIREMENTS <br />SURVEY - Moved 10 OR 1.00 LS 0.00 <br />1ESTING - Moved 10 OR 1.00 LS 0.00 <br />SITE WORK <br />1URF I.OOLS 3,292.50 <br />EXCAVATION 1.00 BID 50,21034 <br />CONCRElE <br />PUMP FACILITY 1.00 LS 28,399.54 <br />WAlER CONlROL "A" 1.00 LS 7,695.07 <br />WAlER CONlROL"8" I.OOLS 8,944.77 <br />EXPANSION I.OOLS 1,438.78 <br />REINFORONG STEEL 1.00 LS 7,84225 <br />PRECAST 1.00 LS 34,25837 <br />CAST IRON 1.00 LS 1,79120 <br />STRUcruAL STEEL <br />PUMP FACILI1Y 1.00 LS 10,080.04 <br />WAlERCONlROL"A" I.OOLS 17,677.00 <br />WAlER CONlROL"8" 1.00 LS 21,164.00 <br />PLUMBING <br />PLUMBING I.OOLS 4,066.28 <br />ELECfRlCAL <br />ELECnUCAL 1.00 LS 29,615.00 <br />TOTAL 226.475.14 <br />