Laserfiche WebLink
<br />PRECAST CONCRETE <br /> Qty. Unit Material . Labor Equipment Material Labor Equipment TOTAL <br /> Unit Unit Unit Total Total Total <br />Pump Facility <br />RCP Class IV - 36 Inch: 58.00 Lf 36.50 15.37 17.24 2,117.00 891.46 1,000.00 4,008.46 <br />Pump WeUa - 48 Inch 16.50 Lf 48.00 40.53 45.45 792.00 668.75 750.00 2,210.75 <br />Gaskets &, Accesories 1.00 LS 610.00 610.00 0.00 0.00 610.00 <br />Grout 1.00 LS 200.00 200.00 0.00 0.00 200.00 <br />Water Control Structure" A" <br />Box Culvert 5' x3' 42.00 Lf 99.50 21.23 23.81 4,179.00 891.66 1,000.00 6,010.66 <br />Box Culvert Ends 2.00 Each 1,700.00 111.45 125.00 3,400.00 222.90 250.00 3,8n.90 <br />Precast Slab 8" x 4' 14.50 Lf 36.75 46.12 51.n 532.88 668.74 750.00 1,951.62 <br />Accessories 1.00 LS 0.00 0.00 0.00 0.00 <br />Testing 1.00 LS 200.00 256.00 150.00 <br />Water Control Structure "8" 0.00 0.00 0.00 0.00 <br />Box Culvert 5' x 3' 66.00 Lf 99.50 13.51 15.15 6,567.00 891.66 1,000.00 8,458.62 <br />Box Culvert Ends 2.00 Each 1,700.00 111.45 125.00 3,400.00 222.90 250.00 3,872.90 <br />Precast Slab 8" x 4' 26.50 Lf 36.75 25.23 28.30 973.88 668.60 750.00 2,392.47 <br />Accesories 1.00 LS 610.00 610.00 0.00 0.00 610.00 <br />Testinlt 1.00 LF 200.00 256.00 150.00 <br />TOTAL 23,381.75 5,126.66 5,750.00 34,258.37 <br />