Laserfiche WebLink
<br />CONCRETB - eo.tmBed <br /> QIy. Unit Material Labor Equipment Ma terial Labor Equipment TOTAL <br /> Unit Unit Unit Tolal Total Total <br />WATERSTRUCTURE"W <br />Base Slab 7.43 Cy. 64.50 479.24 0.00 0.00 479.24 <br />FS Slab 61.2S SFCA 1.10 1.68 6738 102.90 0.00 170.28 <br />Pour Slab 8.00 Hr. 28.22 0.00 225.76 0.00 225.76 <br />Inbeds 2.00 Hr. 32.15 0.00 64_'0 0.00 6430 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 642.00 <br />Pump 14.85 Cy. 2.25 0.00 0.00 33.41 33.41 <br />Wall1 18.93 Cy. 64.50 1,220.99 0.00 0.00 1,220.99 <br />FS Wall 1,022.00 SFCA 1.10 1.68 1,124.20 1,716.96 0.00 2,841.16 <br />Pour Wall 24.00 Hr. 28.22 0.00 677.28 0.00 671.28 <br />Inbeds 4.00 Hr. 32.15 0.00 128.60 0.00 128.60 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 642.00 <br />Pump 14.48 Cy. 2.25 0.00 0.00 32.58 32.58 <br />Shelf Angle 032 Cy. 64.50 20.64 0.00 0.00 20.64 <br />FS Wall 16.00 SFCA 1.50 5.00 24.00 80.00 0.00 104.00 <br />Pour Slab 4.00 Hr. 28.22 0.00 112.88 0.00 112.88 <br />Beam 0.21 Cy 64.50 U.55 0.00 0.00 13.55 <br />FS Wall 24.00 SFCA 1.50 5.00 36.00 120.00 0.00 156.00 <br />Pour Wan 4.00 Hr. 28.22 0.00 112.88 0.00 112.88 <br />Walk Footing 1.12 Cy. 64.50 72.24 0.00 0.00 72.24 <br />Crumb Footing 2.00 Hr. 25.86 0.00 51.72 0.00 51.72 <br />FS Wan 42.00 SFCA 1.50 5.00 63.00 210.00 0.00 273.00 <br />Pour Slab 8.00 Hr. 28.22 0.00 225.76 0.00 225.76 <br />Pump 6.00 Hr. 107.00 0.00 0.00 642.00 642.00 <br />Pump 1.12 Cy. 2.25 0.00 0.00 2.52 2.52 <br />TOTAL WATER CONTROL "0" 3.121.22 3,829.04 1,994.51 8,944.77 <br />