My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03506
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:29 PM
Creation date
10/4/2006 11:49:11 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Lakewood
Stream Name
South Lakewood Gulch
Basin
South Platte
Title
Major Drainageway Planning
Date
8/1/1978
Prepared For
Lakewood
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE VI- 1 <br />PHASE A <br />STORAGE ALTERNATIVES INVESTIGATED * <br />SOUTH LAKEWOOD GULCH <br /> <br />Alternate <br /> <br />Combination of and <br />Location of Storage Ponds <br /> <br />1. <br /> <br />Addenbrooke Pond <br /> <br />2. <br /> <br />Addenbrooke Pond <br /> <br />Rockmont Pond <br /> <br />3. <br /> <br />Addenbrooke Pond <br /> <br />Rockmont Pond <br /> <br />Side Channel at First Avenue <br /> <br />4. <br /> <br />Addenbrooke Pond <br /> <br />Rockmont Pond <br /> <br />Onstream Storage at First Avenue <br /> <br />Notes: <br /> <br />. Addenbrooke Pond is located in Reach and contains 11 acre-feet <br />of available storage. <br /> <br />. Rockmont Pond is located in Reach I I B and contains 22 acre-feet <br />of available storage. <br /> <br />. First Avenue Pond is located in Reach II I and contains 20 acre-feet <br />of available storage. <br /> <br />. It is recommended that any storage improvements be constructed <br />based upon the 100-year design frequency. <br /> <br />Reevaluation of the avai lable stora~e alternatives was ~ade during Phase B <br />in light of reduced flows resulting from total retention storage at <br />Garrison Street. Pond volumes have been revised as follows: <br /> <br />. Existing Addenbrooke Pond - no improvements <br /> <br />. Proposed Garrison Pond - 26-acre-feet <br /> <br />. Improvements to Rockmont Pond - 32-acre feet <br /> <br /> <br />. Improvements to Fi rst Avenue Pond - lO-acre feet <br /> <br />VI-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.