Laserfiche WebLink
<br />COMMENTARY - SHEET 10 OF 12 <br /> <br />I <br />,1 <br />I <br />I <br />I <br />:1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,. <br />I <br /> <br />Fl oodp 1 ai n regul at i on is the recommended plan for thi s reach. An annual <br />operations and maintenance cost of $500 was estimated for this reach to <br />include the cost of debris clean-up. Should improvements be considered <br />as part of future development in this area, the technical data and criteria <br />presented in this report should be utilized and channels should be improved <br />utilizing the latest Urban Storm Drainage Criteria Manual guidelines. <br />