My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03481
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:25 PM
Creation date
10/4/2006 11:48:30 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Arkansas
Title
Post Flood Assessment Report Arkansas River Southern Colorado
Date
9/15/1999
Prepared For
Southern Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.--- TABLE 3-2 . <br />STAFF GAUGE DATA FROM PUGATOIRE RIVER AT <br />TRINIDAD, THATCHER AND BELOW TRINIDAD <br />Location Date-Time Staff Gauge Flow Data (C.F.S.) <br />At Trinidad 30 Apr 99 @ 0600 ills 268.00 <br />(Corps) 30 Apr 99 @ 0900 hrs 769.00 <br /> 30 Apr 99 @ 1200 ills 1,720.00 <br /> 30 Apr 99 @ 1500 ills 2,060.00 <br /> 30 Apr 99 @ 1600 ills 2,190.00 (peak exceeded gauge height) <br /> 30 Apr 99 @ 1900 ills 1780.00 <br /> 30 Apr 99 @ 2200 ills 868.00 <br /> 1 May 99 @ 0000 ills 546.00 <br /> 1 May 99 @ 0600 ills 308.00 <br />Thatcher 30 Apr 99 @ 1600 ills 89.20 <br />(USGS) 30 Apr 99 @ 1900 ills 104.00 <br /> 30 Apr 99 @ 2000 ills 1,170.00 <br /> 1 May 99 @ 0000 ills 3,180.00 <br /> 1 May 99 @ 0300 ills 5,130.00 <br /> 1 May 99 @ 0600 ills 2,900.00 . <br /> 1 May 99 @ 1600 ills 3,380.00 <br /> 1 May 99 @ 1900 ills 6,200.00 <br /> 1 May 99 @ 2000 ills 14,100.00 <br /> 1 May 99@2100ills 15,000.00 (peak exceeded gauge height) <br /> 1 May 99 @ 2200 ills 13,300.00 <br /> 1 May 99 @2300 ills 9,360.00 <br /> 2 May 99 @ 0200 ills 5,450.00 <br /> 2 May 99 @ 0900 ills 2,960.00 <br /> 2 May 99 @ 1700 ills 2,100.00 <br />Below <br />Trinidad 30 Apr 99 @ 0600 ills 0.14 <br /> 30 Apr 99 @ 1000 hrs 0.14 <br /> 30 Apr 99 @ 1100 ills 0.26 (peak exceeded gauge height) <br /> 30 Apr 99 @ 1400 ills 0.26 (peak exceeded gauge height) <br /> 30 Apr 99 @ 1500 ills 0.22 <br /> 30 Apr 99 @ 2000 ills 0.14 <br /> <br />. <br /> <br />Post Flood Assessment Report <br /> <br />18 <br /> <br />Chapter 3 - Flood of April 29, 1999 <br />Draft Revised 09/09/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.