Laserfiche WebLink
<br />3. Dike - station 383.00 to station 383.25 <br /> <br />Fill -.32 cu yd/Ft X 1100'= 35.200 <br />Cost - 35,200 X $2.50 = $88,000.00 <br />Rock - 3 cu yd/Ft X 1100' <br />Cost - 3300 X $18.00 = 59,400.00 <br /> <br />TOTAL REACH IMPROVEMENT COST $147,400.00 <br /> <br />4. Reshaping right bank - station 383.50 to 383.65 <br /> <br />Grade - 6,700 cu yd @ $2.00 <br />Rock - 1400 cu yd @ $18.00 <br /> <br />= 13,400.00 <br />25,200.00 <br /> <br />TOTAL REACH IMPROVEMENT COST $ 38,600.00 <br /> <br />5. Rip-rap leFt bank - station 383.30 to 383.80 <br /> <br />Grade - 3,000 cu yd @ $2.50 <br />Rock - 2800' X 3.0 @ $18.00 <br /> <br />=$ 7,500.00 <br />= 151,200.00 <br /> <br />TOTAL REACH IMPROVEMENT COST $158,700.00 <br /> <br />6. Rip-rap leFt bank - station 384.00 <br /> <br />Rock - 400' X 3.0 @ $18.00 <br /> <br />=$ 21,600.00 <br /> <br />TOTAL REACH IMPROVEMENT COST $ 21,600.00 <br /> <br />SUB-TOTAL COST $586,121.00 <br /> <br />Contingencies 10% 58,612.00 <br /> <br />Legal & Administration 3% 17,500.00 <br /> <br />Engineering 7% 41,000.00 <br /> <br />Construction Inspection 3% 17,500.00 <br /> <br />TOTAL PROJECT COST $720,733.00 <br />