Laserfiche WebLink
<br />CONSTRUCTION <br /> <br />S{f <br />u..AAJ..A.A.J <br />~ <br />~ <br /> <br /> <br />4 <br /> <br />The prime contractor for Crystal Dam <br />(Curecanti Unit) made good progress <br />with excavation of the keyway to bed. <br />rock and preparation for placement of <br />concrete in early 1975. An extension <br />of the Curecanti.Crystal 115.kV trans- <br />mission line was completed, and bi. <br />tuminous surfacing was placed on <br />roadways and parking areas at Morrow <br />POint and Blue Mesa Dams. <br /> <br />On the Glen Canyon Unit, exploratory <br />wells to determine the Lake Powell bank <br />storage were completed. A contract was <br />awarded in June 1974 to seal coat the <br />streets of Page, Ariz. <br /> <br />Two contracts to rehabilitate the canal <br />and laterals of the Hammond Project <br />were awarded. <br /> <br />Exploratory drilling at the proposed <br />Stateline Dam site, Lyman Project. was <br />completed. The drilling was required <br />to determine feasibility of the site as an <br />alternate to the China Meadows site. <br /> <br />A contract for spiltway repair was <br /> <br />awarded during the year on the lemon <br />Dam, Florida Project, and the work was <br />substantially completed by the end of <br />the fiscal year. <br /> <br />Contracts on the Bonneville Unit, Cen. <br />tral Utah ProJect, that were completed <br />include an overlook fence at Soldier <br />Creek Dam; Knight DIversion Dam mod. <br />Ification; earthlining Channel No.2. <br />Strawberry Aqueduct; and connecting <br />Currant and layout Tunnels with 132. <br />inch.diameter pipe for the Water Hollow <br />crossing. Clearing 01 the Strawberry <br />Reservoir Enlargement was underway. <br /> <br />A contract lor the Bostwick Park later. <br />als (Bostwick Park Project, Colorado) <br />was awarded and completed. <br /> <br />On the Navajo Indian Irrigation Project <br />work continued on the main canal, on <br />the access road, and on Tunnel NO.4. <br /> <br />Block No.1 drains on the Emery County <br />Project were completed and a contract <br />awarded for the Block No.2 drains. <br />