My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03474
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:22 AM
Creation date
10/4/2006 11:47:52 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Arapahoe
Douglas
Community
Denver Metroploitan Area
Stream Name
South Platte River, Chatfield Dam to Baseline Road
Basin
South Platte
Title
Major Drainageway Planning
Date
8/1/1984
Prepared For
Denver Metropolitan Area
Prepared By
Wright Water Engineers, Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />RATE OF REPAYMENT <br /> <br /> <br />v..A.A $.AA.J <br /> <br />'I..A.A.A.A.A.A <br />'I..A.A.A.A.A.A <br /> <br />Revenue applied on repayment of the <br />Federal Investment totaled $10.4 mil. <br />lion In fIscal year 1974. This brought <br />total repayment through fiscal year <br />197410 $49.5 million which IS approxI- <br />mately 7 percent of the completed plant <br />In service and 2.5 percent 01 the $1.9 <br />billion projected total reimbursable <br />Federal Investment in the project. In <br />additIon to the amount applied on reo <br />payment. the project earned revenue <br />suflicmnt to pay all operating and in. <br />terest charges. Operating costs of units <br />and partiCipating prOjects turned over <br />to water conser'ilancy distncts fOr op- <br />eratIOn were paid by the respective con. <br />servancy districts. About one-thIrd of <br />the projected lolal reimbursable fed. <br />eral Investment was In service as of the <br />end of tile year. <br /> <br />About $9.9 mIllion or 95 percent of the <br />repayment revenues received in flscaJ <br />year 1974 came from the sale of power <br />and was applied to repayment of the <br />power Investment. About 7 percent of <br />tile projected total power Investment <br />has now been repaid. The $9.9 million <br /> <br />26 <br /> <br />IS a 25 percent reduction In net reve. <br />nue from fiscal year 1973_ The reduction <br />was the result principally of purchaSing <br />energy 10 meet contractual obligatIons <br />when generation at Glen Canyon was <br />temporarily cut back to comply With <br />the fIlling cnleria in P.L. 90.537. <br /> <br />Approximately $330.000 in repayment <br />revenue came from muniCipal and in' <br />dustrial water sales m fiscal year 1974, <br />mostly from sales from the Glen Can. <br />yon and NavajO Units, but also from <br />four particlpatlllg projects. ThiS reve. <br />nue totaled 10 percent above last year. <br />M&J revenue was received from Glen <br />Canyon and two 01 the participating <br />projects for the first time. The $330" <br />000 was applied to repayment of the <br />mUniCIpal and industrial water Invest. <br />ment. <br /> <br />Water users of seven partICIpating proj. <br />ects paid approximately $240.000 for <br />irrigation water Ser....,ce dUring the year. <br />All of thiS revenue was applied to repay- <br />ment on the investment which now to. <br />tals about $185 million, but which is <br />projected to grow to about $1 billion <br />when all authOrIZed participating proj. <br />ects are completed. <br /> <br />In order to provide revenues suffiCIent <br />to repay the projected reimbursable <br />costs of authorized storage units and <br />also to provide the needed repayment <br />assIstance for authOrized participating <br />projects within the time limits pre. <br /> <br />SCribed by law. It WIll be necessary to <br />make a second Increase in the CRSP <br />power selling rate. The Increase reo <br />qUired will place the selling rate about <br />8.5 percent above the current rate, <br />which became effective April 1, 1974, <br />and about 10.4 percent above the origi. <br />nal rate which was in effect to April <br />1974. The Increase is reflected In Ex <br />hlblt F. <br /> <br />Reasons for the prOjected Increase are <br />the InflatIonary rise In present and pro- <br />rected power. system operatlrlg costs, es. <br />tlmales 01 higher costs to complete con. <br />struction of authorized units and par. <br />tlcipatlng project faCilities, reduction III <br />estimated power revenue income be- <br />cause of prOjected acceleratIon of water <br />depletlons. and the inclusion of future <br />payment from power revenue of a par. <br />tlon of the estimated construction and <br />operatmg costs of speCified units of the <br />Colorado River Salirllty Control Program <br />(P.l. 93320-88 Stal. 266). <br /> <br />Projections uSing current estimates of <br />CRSP costs. construction schedules <br />and Increased net Income from power <br />and water sales. ad valorem taxes and <br />miscellaneous revenue, show that pay. <br />out of the reimbursable costs of the au. <br />thomed Colorado River Storage Proj <br />ect and Participating Projects can be <br />accomplished Within authorized repay. <br />ment periods (Exhibit F). <br />
The URL can be used to link to this page
Your browser does not support the video tag.