My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03474
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03474
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:22 AM
Creation date
10/4/2006 11:47:52 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Arapahoe
Douglas
Community
Denver Metroploitan Area
Stream Name
South Platte River, Chatfield Dam to Baseline Road
Basin
South Platte
Title
Major Drainageway Planning
Date
8/1/1984
Prepared For
Denver Metropolitan Area
Prepared By
Wright Water Engineers, Inc.
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RECREATION <br /> <br /> <br />~ <br />\..AA.A.AA.J <br />I..AA..A.AA.J <br />During fiscal year 1974. major Improve- <br />ments and additions were made to rec- <br />reation facilities in the Glen Canyon- <br />lake Powell area, at Blue Mesa Reser. <br />vOir 01 the Curecantl Unit. and at Heron <br />Reservoir of the San Juan.Chama Proj- <br />ect. At the Glen Canyon National Recre- <br />atIOn Area. a contract was awarded for <br />rehabilitation 01 the manna at Rainbow <br />Bridge. In the Curecanti Recreation <br />Area, lake FOrk site, picnic area roads, <br />a parking area, comfort stations, and a <br />fish.cleaning station were completed. A <br />contract for construction of a boat ramp <br />parkmg area at Elk Creek was awarded. <br />A temporary information station was in <br />operation at Cimarron. At Heron Reser. <br />voir two utility systems and access <br />roads were completed. <br /> <br />Contracts were awarded for upstream <br />reservOir stabilization (Emery County); <br /> <br />14 <br /> <br />enlarging Elk Creek Parking Area (Cure. <br />canh Unit); and construction was com. <br />pleted for access roads and parking at <br />the San Juan and Simon Point recrea- <br />tion sites (Navajo Unit). <br /> <br />For the tailwater below Navajo Dam. <br />which has developed into a "blue rib. <br />bon" trout stream, plans were prepared <br />for recreation facilities. Access roads <br />and parking areas were completed. <br />Since completion of Starvation Reser. <br />voir, Bonneville UM. the boat ramp, <br />parking area, and access roads have <br />been so heavily used that plans have <br />been prepared for expanding these fa. <br />cilltles. Facilities are complete at the <br />following reservoirs: Huntington North, <br />Lemon, Paonia, Rifle Gap, Crawford, <br />and Steinaker. Facilities have yet to be <br />constructed at Meeks Cabin Reservoir <br />of the Lyman Project and Silver Jack <br />Reservoir of the Bostwick Park Project. <br /> <br />The Bureau 01 Reclamation has as. <br />sumed the administrative responsibili. <br />ties for the recreation aspects of the <br />Fontenelle Reservoir Area. Plans have <br />been made to expand existing recrea. <br />tion and public information facilities. A <br />full.time employee has been hired to <br />supervise operation and maintenance <br />and the constructlon of the additional <br />facilities. A Youth Conservation Corps <br />camp was established in the spring of <br />1974 to assist in this elfort. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.