Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PAGE 9 <br /> <br />S. ?ANITATION <br /> <br />1. Sewage: Pumped Gravity___ <br />2. Shower: YES NO How many? <br /> <br />3. Bathrooms: <br /> <br />Mens <br /> <br />Womens <br /> <br />REMARKS - COMMENTS <br /> <br />ADDITIONAL TOILET FACILITIES IN EACH BUNK ROOM <br /> <br />T. 24 HOUR OPERATIONS (EOC) <br /> <br />1. Does this EOC have the ability to go into an immediate <br />24-hour operation with no advance notice? YES NO____ <br /> <br />If no, how long (hours) to activate for natural disaster <br />operations? __Hours <br /> <br />2. How long (hours) for nuclear button-u~ operations?__ HRS <br /> <br />3. Are any day-to-day, 24 hour operations conducted from <br />the EOC? YES __NO <br /> <br />If yes, what are they? <br /> <br />4. Are EOC activation procedures prepared and <br />available? YES NO <br />-- <br /> <br />U. ~MP (ELECTRO MAGNETIC PULSE) <br /> <br />1. Has the EOC been EMP surveyed? <br />2. Has the EOC been EMP protected? <br /> <br />YES_-=--NO <br />YES NO <br /> <br />3. If yes: <br />Where is ground located? Water Supply System, Attached in Pwr Room. <br />Are antennas treated? ., <br />Is electrical system treated?___~ <br />4. Engineering accomplished by what type of agency? <br />Architect State EMP Analyst <br />FEMA Analyst Other (please explain) <br /> <br />~ <br />