My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03473
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:24 PM
Creation date
10/4/2006 11:47:49 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Region VIII
Basin
Statewide
Title
Comprehensive Cooperative Agreement
Date
1/1/1989
Prepared For
Region VIII
Prepared By
FEMA
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PAGE 9 <br /> <br />S. ?ANITATION <br /> <br />1. Sewage: Pumped Gravity___ <br />2. Shower: YES NO How many? <br /> <br />3. Bathrooms: <br /> <br />Mens <br /> <br />Womens <br /> <br />REMARKS - COMMENTS <br /> <br />ADDITIONAL TOILET FACILITIES IN EACH BUNK ROOM <br /> <br />T. 24 HOUR OPERATIONS (EOC) <br /> <br />1. Does this EOC have the ability to go into an immediate <br />24-hour operation with no advance notice? YES NO____ <br /> <br />If no, how long (hours) to activate for natural disaster <br />operations? __Hours <br /> <br />2. How long (hours) for nuclear button-u~ operations?__ HRS <br /> <br />3. Are any day-to-day, 24 hour operations conducted from <br />the EOC? YES __NO <br /> <br />If yes, what are they? <br /> <br />4. Are EOC activation procedures prepared and <br />available? YES NO <br />-- <br /> <br />U. ~MP (ELECTRO MAGNETIC PULSE) <br /> <br />1. Has the EOC been EMP surveyed? <br />2. Has the EOC been EMP protected? <br /> <br />YES_-=--NO <br />YES NO <br /> <br />3. If yes: <br />Where is ground located? Water Supply System, Attached in Pwr Room. <br />Are antennas treated? ., <br />Is electrical system treated?___~ <br />4. Engineering accomplished by what type of agency? <br />Architect State EMP Analyst <br />FEMA Analyst Other (please explain) <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.