Laserfiche WebLink
<br />Page 23 <br /> <br />d. Detention Pond Depth - Parking Areas <br />5 year storm - 0.5 feet maximum* <br />100 year storm - 1.0 feet maximum* <br /> <br />*These values may be doubled for remote, little used areas of park- <br />ing lots. If remote areas are not used for detention or are not <br />available, the volume and release rate criteria specified herein <br />will result in some detention being required off the parking lot <br />(roughly 50% of the five year volume). <br /> <br />3) Excess Storm Water Passage: The detention pond shall be so designed <br />to safely pass the maximum peak discharge for a major storm (100 <br />year) assuming the outlet structure is inoperative and the upstream <br />watershed is fully developed to current zoning or current develop- <br />ment, whichever provides the greater runoff. No buildings or struc- <br />tures shall be constructed in the path of such excess storm water <br />passage. <br />