My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03429
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:16 PM
Creation date
10/4/2006 11:45:40 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Westminster
Stream Name
North Cotton Creek
Basin
South Platte
Title
LOMR - Affected Panel 08008 0003 C - Case No. 99-08-376P
Date
2/1/2000
Prepared For
Westminster
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 1,400 feet upstream of Stuart Street <br />Approximately 2,100 feet upstream of Stuart Street <br />Approximately 2,300 feet upstream of Stuart Street <br /> <br />5,307 <br />5,323 <br />5,329 <br /> <br />5,305 <br />5,325 <br />5,328 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Denver Post on or about <br />March 10 and March 17, 2000. A copy of this notification is enclosed. In addition, a notice of changes <br />will be published in the Federal Register. Within 90 days of the second publication in the Denver Post, <br />a citizen may request that FEMA reconsider the determination made by this LOMR. Any request for <br />reconsideration must be based on scientific or technical data. All interested parties are on notice that, <br />until the 9O-day period elapses, the determination to modify the BFEs presented in this LOMR may itself <br />be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information. <br />We also encourage you to prepare a related article for publication in your community's local newspaper. <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFIP maps. <br /> <br />We are processing a revised FIRM and FIS report for Jefferson County in our countywide format; <br />therefore, we will not physically revise and republish the FIRM and FIS report for your community to <br />incorporate the modifications made by this LOMR at this time. Preliminary copies of the countywide <br />FIRM and FIS report, which present information from the effective FIRMs and FIS reports for your <br />community and other incorporated communities in Jefferson County, were submitted to your community <br />for review on September 30, 1999. We will incorporate the modifications made by this LOMR into the <br />countywide FIRM and FIS report before they become effective. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, the <br />floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable to <br />your community and adopted by appropriate community action, as specified in Paragraph 60. 3( d) of the <br />NFIP regulations. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development, and for ensuring all necessary permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.