My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03422
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:27:14 PM
Creation date
10/4/2006 11:45:24 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
na
Basin
Statewide
Title
Flood Hazard Mitigation Plan
Date
2/1/1998
Prepared For
State of Colorado
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t99S. Colorado Rood Hazard Mitigation Plan (409) <br /> <br />were estimated by the Colorado Water Conservation <br />Board and the U_S_ Geological Suvey (USGS)_ The <br />CWCB obtained detailed surveyed cross-sections on <br />the North Fork of the South Platte River, Sand Draw, I <br />and Buffalo Creek. The estimated flow rates on July 12 <br />range from 4 to 25 times the published FEMA 100- <br />year flow values_ Obviously, the Buffalo Creek flash <br />flood produced enormous flow magnitudes and was <br />extremely dangerous_ <br /> <br />2.4 <br /> <br />Risk Information <br /> <br />To reduce the community's vulnerability to hazards, <br />some knowledge of the riskllhreat must exist Thus, <br />hazards assessment has two important components <br /> <br />1_ Hazard Identification - What are the hazards <br />that pose a threat to the community or a <br />particular segment of the population? What <br />is their expected magnitude? How fre- <br />quently could they be expected to occur? <br />Where are they likely to occur? <br /> <br />2_ Vulnerability Analysis - What is the risk <br />from the threat? What are the likely im- <br />pacts? What are the economic, social, and <br />political ramifications of these impacts? <br /> <br />In most communities, substantial work has al- <br />ready been completed on a hazard assessment, <br />and maps portraying these risks are readily avail- <br />able_ This is an integral step in the emergency <br />planning process_ Hazard assessment is the foun- <br />dation upon which the local Emergency Opera- <br />tions Plan (EOP) is built It is also the foundation <br />for hazard mitigation planning, as well. <br /> <br />A hazard assessment provides the information <br />that identifies the need to mitigate, as well as the <br />ability to accurately focus mitigation efforts on a <br />particular problem area_ However, simply identify- <br />ing vulnerability from an identified risk does not <br />guarantee that any action will be undertaken to <br />mitigate that situation_ Thus, a critical component <br />necessary to mitigate the impacts of hazards is a <br />determination of acceptable risk. When vulnera- <br />bility to a hazard risk is determined to be at an <br />acceptable level, mitigation activities are not pur- <br />sued_ However, when communities determine that <br />the vulnerability to a given risk is too great to <br />chance (a determination of unacceptable risk), <br />mitigation is pursued_ (See Figure 2. 10)_ <br /> <br />This concept of acceptable risk is central to the <br />community's determination as to whether mitiga- <br />tion is undertaken or not_ This determination is <br />typically answered based on community values <br />being combined with technical information_ Hazard <br />assessments allow communities to focus on haz- <br />ard mitigation planning needs_ However, imple- <br /> <br />Fi/e:FHMP-chaprer-2.pub <br /> <br />mentation of mitigation measures will only occur fol- <br />lowing the public's acceptance of both the problem <br />and the solution_ This requires a determination that <br />there is unacceptable risk. <br /> <br />To sum up, the hazard mitigation planning process <br />begins with the five preliminary steps relating to haz- <br />ard assessment First, the hazards affecting the juris- <br />diction must be identified_ Second, the community's <br />vulnerability to those hazards must be determined_ <br />, Third, a determination of whether that vulnerability <br />constitutes an unacceptable risk must be made_ <br />Fourth, if an unacceptable risk exists, it must be <br />communicated to those who are in the position to <br />effect its change_ Fifth, the people receiving this risk <br />information must agree that the risk is unacceptable, <br />that there are viable solutions to the problem, and that <br /> <br />_> ~-!. ~,.:.,' :.'.1: i >~Z.!JJp_"" <br /> <br />J <br /> <br />I Hazard <br />Vulnerability <br /> <br />Community <br />Goals <br /> <br />Community <br />Values <br /> <br />1 <br /> <br />/\ <br /> <br />(community goals. long term objec:tives <br />e.g. capital improvements, open space <br />acquisitions) <br /> <br />.__ _, _1:">.'--'-~ _,_ ^__~,.... <br /> <br />---- <br /> <br />Figure 2.10 <br /> <br />.v.'.,,' ,_ " I;;.: ,_'1, _'.J"-, ''''' .,.~' <br /> <br />Chapter 2 . 12 <br /> <br />1129P.l8 10:48 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.