My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03369
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:22 AM
Creation date
10/4/2006 11:41:20 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Bent
Otero
Community
Southeastern Colorado
Stream Name
Arkansas River
Basin
Arkansas
Title
Post Flood Assessment Report Arkansas River
Date
9/15/1999
Prepared For
State of Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c~rrst:ructed several small dams in the watershed to control small tributary flows. It should be <br />noted that the St Charles Reservoir south of Pueblo is not actually on the St Charles River and <br />therefore provides no flood protection along the St Charles River. <br /> <br />The Bureau of Reclamation (BuRec) constructed the Fryingpan-Arkansas Project to help <br />supplement the water supply in the Arkansas River Basin in Colorado. The project was <br />authorized in 1962 and completed in June 1981. The project provides municipal and industrial <br />water supply, supplemental irrigation, hydroelectric power production, flood control, and fish <br />and wildlife enhancement. The Fryingpan-Arkansas Project is separated by the Continental <br />Divide which rises over 12,000 feet in many places. The two halves of the project are the <br />Western Slope, located within the boundaries of the White River National Forest at elevations <br />above 10,000 feet; and the Eastern Slope in the Arkansas River Valley. The project facilities <br />primarily divert water from the Western Slope to the water-short areas on the Eastern Slope. <br />Major facilities consist of six storage dams and reservoirs, 16 diversion structures, and nine <br />tunnels. The project makes possible an average annual diversion of 69,200 acre-feet of trans- <br />mountain water. The project supplements the trans-mountain water diversion capability of the <br />Hoosier Tunnel and Homestake Water Development Project, two prior trans-mountain projects <br />constructed by local governments. <br /> <br />Pueblo Dam and Reservoir is the terminal storage facility for the Fryingpan-Arkansas project and <br />is located about 6 miles upstream of Pueblo. The dam was completed in 1975 and includes <br />93,000 acre-feet of storage allocated to flood control. Pueblo Dam was constructed on top of the <br />Rock Canyon Barrier Dam, a local flood protection project constructed between 1924-1925. <br />About one-third of the Arkansas River Basin above Las Animas is controlled by Pueblo Dam; <br />however, storms occurring over the large uncontrolled drainage area below Pueblo Dam continue <br />to produce major floods at La Junta. <br /> <br />Post Flood Assessment Report <br /> <br />Chapter 2 - History of Flooding and Flood Protection <br />12 Draft Revised 09109199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.