My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD03369
CWCB
>
Floodplain Documents
>
Backfile
>
3001-4000
>
FLOOD03369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:22 AM
Creation date
10/4/2006 11:41:20 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Bent
Otero
Community
Southeastern Colorado
Stream Name
Arkansas River
Basin
Arkansas
Title
Post Flood Assessment Report Arkansas River
Date
9/15/1999
Prepared For
State of Colorado
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado eligible for Federal Disaster Assistance. <br /> <br />AUTHORIZATION FOR REPORT <br /> <br />Post Flood Assessment reports are authorized under Flood Control and Coastal Emergencies <br />Program (FC&CE) program. The FC&CE program is financed by appropriation 96X3l25 and is <br />authorized by Public Law (PL) 84-99, as amended. These reports are also authorized under the <br />Flood Plain Management Services (FPMS) Program under Section 206, 1960 Flood Control Act, <br />PL 86-645. The program is financed by the General Investigations appropriation 96X3121. This <br />report was prepared under the FPMS program in response to a request for technical support from <br />the Colorado Water Conservation Board. <br /> <br />SCOPE OF REPORT <br /> <br />This report provides a description ofthe flooding experienced along the Arkansas River and its <br />main tributaries south of Pueblo to Las Animas between April 29 and May 2, 1999. An <br />evaluation of the flood damages sustained and prevented is provided. Current flood management <br />systems are described and their performance is evaluated. A review of past flood history is also <br />provided. The report also contains recommendations for future study of flood management <br />system improvements based on a cursory evaluation of areas at risk and potential for significant <br />flood damages. Environmental factors that could influence future flood management system <br />improvements are provided in an appendix to this report. <br /> <br />Post Flood Assessment Report <br /> <br />3 <br /> <br />Chapter 1 - Introduction <br />Draft Revised 09/09/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.